Elephant and Castle, Bermondsey and Peckham
Southwark is leading a 15 year, £4 billion programme at Elephant and Castle, names four opportunity areas in its 2022 plan and says it is the largest local council landlord in London. We write fire strategies for new council homes, estate renewal phases, railway arch conversions and the borough's listed buildings.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Southwark buildings
Southwark Council says at least 5,000 new and replacement homes are being built at Elephant and Castle, with at least 1,650 of them affordable. The old shopping centre closed in autumn 2020 and a new Northern line ticket hall is under construction. Elephant Park, which Lendlease began on the former Heygate estate site in 2014, will have around 3,000 homes when complete.
The Southwark Plan was adopted on 23rd February 2022 and runs from 2019 to 2036, with a target of 40,035 homes. It names the Bankside, Borough and London Bridge area, Elephant and Castle, Old Kent Road and Canada Water as opportunity areas. The council aims to create 11,000 new council homes by 2043 and had built 2,190 of them by March 2026, with 562 more started.
A Southwark Council briefing records that on 3rd July 2009 a fire broke out in a ninth floor flat at Lakanal House, a fourteen storey block built in the 1950s on the Sceaux Gardens Estate in Camberwell. Six people died. London Fire Brigade moved its headquarters into leased commercial premises in Southwark in 2008.
Who decides
Who approves a fire strategy in Southwark
- Planning
- Southwark Council (official source, opens in a new tab)
- The London Borough of Southwark decides applications under the Southwark Plan 2022.
- Building control
- Southwark Council building control (official source, opens in a new tab)
- A council service, applied to through the Planning Portal or direct. Higher-risk buildings go to the Building Safety Regulator instead.
- Fire station
- Old Kent Road Fire Station (official source, opens in a new tab)
- Home to one of the three 64m turntable ladders in the London Fire Brigade fleet.
- Elephant and Castle
- Elephant and Castle programme (official source, opens in a new tab)
- The council's page for the £4 billion regeneration of the area.
Local issues
What a Southwark fire strategy has to deal with.
A town centre built in stages
The new Elephant and Castle town centre will include up to 450,000 square feet of retail space alongside the new homes. Building it plot by plot means each finished block must have working escape routes and fire service access while the plots around it are still construction sites.
Council homes on the Aylesbury
The council said on 5th March 2026 that its partnership with Notting Hill Genesis had delivered over 700 homes on the Aylesbury Estate since 2014, with 321 more in construction. Phase 2B, of 640 homes, was then awaiting final planning permission. Large blocks of council flats need compartmentation between homes and protected stairs. The taller ones also follow the higher-risk building route.
Homes and hazards in railway arches
A Southwark Article 4 direction means converting businesses in railway arches into homes needs planning permission. In October 2026 ten engines attended a fire in a Silwood Street arch in Bermondsey used for metal recycling, which LFB said was believed to have been accidental and to have involved a lithium-ion battery. Deep arch units with a single frontage need their storage, separation and escape from the back checked whenever the use changes.
Public space at the top of towers
Policy P17 expects tall buildings mainly in major town centres, opportunity area cores, action area cores and the Central Activities Zone. It asks each one to provide a publicly accessible space at or near the top. Visitors on the upper floors add a population that the evacuation strategy, stairs and lifts must be sized to handle.
Building types
The building types we see in Southwark
- Fire Strategy for Blocks of Flats and Apartments
New council homes across the borough, the Aylesbury Estate and Elephant Park
- Fire Strategy for Mixed Use Developments
The Elephant and Castle town centre and the Canada Water Masterplan with British Land
- Fire Strategy for Heritage Buildings and Conversions
Southwark Cathedral at Grade I, Dulwich Picture Gallery at Grade II* and railway arch units in Bermondsey
- Fire Strategy for Hospitals and Healthcare Buildings
Guy's Hospital, whose main building with its wings and chapel is listed Grade II*
What we deliver
Fire strategy services in Southwark.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Gateway 2 and Gateway 3 Support
Higher-risk buildings, BSR submissions, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read moreCommon questions
Fire strategy questions in Southwark, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsSouthwark Council runs its own building control service, with applications made through the Planning Portal or straight to the council. A building that counts as higher-risk is approved by the Building Safety Regulator.
Guides
Guides worth reading first.
More in London
All locationsFire strategy in Southwark
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply