Euston, King's Cross, Kentish Town and Hampstead
Camden has 40 conservation areas covering about half the borough, more than 5,600 listed buildings and a council programme of 4,850 new homes. We write fire strategies for council housing, high-rise blocks, research buildings and the stations and museums of King's Cross and Bloomsbury.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Camden buildings
Camden's adopted Local Plan dates from 3rd July 2017. Its replacement went to the Secretary of State on Friday 3rd October 2025 and was examined at hearings in May and June 2026. The main modifications identified by the Inspector were published on 12th October 2026, with consultation closing on Monday 23rd November 2026.
In September 2022 the council committed an additional £1.3 billion to its Community Investment Programme. The programme now aims to build 4,850 homes in total, including 1,800 council homes and 350 Camden Living Rent homes. The draft plan expects Euston to deliver between 1,500 and 2,500 new homes and its Camley Street and St Pancras Way allocations near King's Cross to provide about 1,380.
On 15th June 2026 the Planning Committee resolved to grant permission for the Land at Regis Road in Kentish Town, a scheme that includes a Camden Film Quarter. LFB notes that HS2 has at least three large engineering and construction sites in the borough.
Who decides
Who approves a fire strategy in Camden
- Planning
- Camden Council (official source, opens in a new tab)
- The London Borough of Camden, except for sites in the Oxford Street area, which passed to the OSDC on 10th August 2026.
- Building control
- Camden building control (official source, opens in a new tab)
- Council surveyors who inspect on site and decide full plans applications within six weeks. The Building Safety Regulator takes the role for higher-risk buildings.
- Fire station
- Euston Fire Station (official source, opens in a new tab)
- Euston station sits on Euston Road. LFB lists Kentish Town and West Hampstead as Camden's other two stations.
- Local Plan
- Main modifications to the Local Plan (official source, opens in a new tab)
- Camden's consultation page for the Inspector's changes to the new plan.
Local issues
What a Camden fire strategy has to deal with.
Blocks on simultaneous evacuation
LFB's 2026/27 risk plan records 34 high-rise residential buildings in Camden where the fire risk assessment found the safety features inadequate and a temporary simultaneous evacuation strategy is in place. Returning such a block to stay put means first putting right the safety features the assessment found inadequate. A revised fire strategy then has to show why a stay put approach is safe again.
A height threshold that counts plant
Draft Policy D2, still subject to the main modifications, treats buildings over 40 metres in the Central Activities Zone and over 30 metres elsewhere as tall. It measures to the top of any rooftop structure, including plant and lift overruns. The higher-risk building test under the Building Safety Act measures height differently, which means a design team has to work out both figures at the outset.
Research labs at scale
LFB describes the Francis Crick Institute as the largest biomedical research facility in Europe, with 1,500 staff over 12 floors. Laboratories typically hold chemicals and compressed gases inside a large occupied building. Their fire strategy has to tie compartmentation and extraction to the hazards held on each floor.
Grade I stations and museums
St Pancras Station with the former Midland Grand Hotel, King's Cross Station and the British Museum are all listed Grade I. Busy public buildings in listed fabric need escape capacity for large crowds without losing the features that earned the listing. The Roundhouse, at Grade II*, raises the same question for a performance venue in historic fabric.
Building types
The building types we see in Camden
- Fire Strategy for High-Rise Residential Buildings
The large stock of residential high-rise blocks noted by LFB and new homes under the Community Investment Programme
- Fire Strategy for Transport and Infrastructure
St Pancras and King's Cross stations, Euston and the HS2 construction sites
- Fire Strategy for Heritage Buildings and Conversions
The British Museum, the British Library, the Roundhouse and Camden Town Hall
- Fire Strategy for Hospitals and Healthcare Buildings
The Royal Free Hospital on Pond Street
What we deliver
Fire strategy services in Camden.

Building Safety Case Reports
Building Safety Act 2022, England
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Gateway 2 and Gateway 3 Support
Higher-risk buildings, BSR submissions, UK wide
Read moreCommon questions
Fire strategy questions in Camden, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsThe Oxford Street Development Corporation took over planning decisions for sites in its area on 10th August 2026. Camden says the Corporation uses the council's development plan and supplementary planning documents to decide them.
Guides
Guides worth reading first.
More in London
All locationsFire strategy in Camden
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote