Fire strategy for Barking and Dagenham buildings

The 2037 Local Plan sets a requirement of 38,864 new homes between 2020/21 and 2036/37, paired with some 20,000 new jobs. It counts a building as tall above six storeys or 18 metres. Heights up to 95 metres may suit Barking and the River Roding, five other strategic areas stop at 50 metres and Becontree Heath and Rush Green has no tall building zone at all.

Barking Riverside Station opened in July 2022 and the Thames Clipper extension to Barking Riverside Pier opened in April 2022. The GLA's 2025 pen portrait records an application to raise the scheme from 10,800 to 20,000 homes. The 2004 order that created the London Thames Gateway Development Corporation named Barking and Dagenham among its councils. The GLA inherited the corporation's obligations when it ceased to exist in 2012.

The borough has four conservation areas, among them Dagenham Village and the Chadwell Heath Anti-aircraft Gun Site, along with 45 listed buildings and structures. On 11th November 2025 the Cabinet approved two Article 4 Directions for the Becontree Estate, one on porches and one on side and roof alterations to corner blocks. The council said they would be introduced in November 2026.

Who decides

Who approves a fire strategy in Barking and Dagenham

Planning
London Borough of Barking and Dagenham (official source, opens in a new tab)
Be First, the regeneration company the council wholly owns, provides statutory planning services on its behalf.
Building control
Be First Building Control (official source, opens in a new tab)
Be First also checks building regulations work in the borough. Approval for a higher-risk building rests with the Building Safety Regulator.
Fire station
Barking Fire Station (official source, opens in a new tab)
LFB's history page lists a pump, a pump ladder, a bulk foam unit and a hose laying lorry at Alfreds Way.
Local plan
Barking and Dagenham 2037 Local Plan (official source, opens in a new tab)
Adopted at Assembly in September 2024, with tall building heights set by Policy DMD 2.

Local issues

What a Barking and Dagenham fire strategy has to deal with.

01

Timber between houses at Barking Riverside

The GLA's decision MD2514 records that a fire in June 2019 damaged Samuel Garside House at De Pass Gardens, a block in one phase of Barking Riverside. Fire engineers reviewed the estate's house types and recommended fire breaks where continuous timber ran between houses. Cavity barriers and fire breaks in terraces have to be drawn clearly and checked as they are built.

02

Balcony fires on Barking blocks

In April 2026 LFB reported a fire that destroyed a 16th floor balcony on an 18 floor block at Arboretum Place and another that damaged a balcony on a seven storey block in Abbey Road. A strategy for a tall block has to show how a balcony fire is kept from climbing the facade into the flats above.

03

Height near Barking Abbey

Policy DMD 2 allows up to 95 metres in Barking and the River Roding but suggests 50 metres in parts of it to protect views of Barking Abbey. It also asks tall buildings to include measures to help prevent suicide and accidental falls. Those measures at roofs and balconies have to sit alongside firefighting access and the escape design.

04

Industry at Dagenham Dock

The Local Plan makes Dagenham Dock and the Freeport strategic area SPP3 and notes the only operational intermodal rail terminal in London other than ports. LFB used a 32 metre turntable ladder as an observation tower at a River Road warehouse fire on 25th April 2025. Large sheds need compartment sizes, sprinkler choices and appliance routes settled at the outset.

Building types

The building types we see in Barking and Dagenham

Common questions

Fire strategy questions in Barking and Dagenham, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Be First delivers planning, building control and local land charges for the council. Its building control team does not answer planning queries, which go to its planning team instead.

Guides

Guides worth reading first.

More in London

All locations

Fire strategy in Barking and Dagenham

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.