Skip to content

Romford, Hornchurch, Rainham and Harold Hill

Around half of Havering's space is designated parkland and the borough has 11 conservation areas, from the Gidea Park garden suburb to RAF Hornchurch. We write fire strategies for Romford's estate renewal, Rainham's riverside homes and the borough's listed churches, halls and theatre.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Havering buildings

Full council approved the Havering Local Plan on 17th November 2021, replacing the 2008 Core Strategy and the Romford Area Action Plan. The Romford Town Centre Masterplan SPD followed in 2025. In the GLA's new London Plan consultation the council formally objected to proposals that would raise its housing target by around 69 percent.

The 12 Sites joint venture with Wates Residential aims to deliver over 3,500 homes across existing housing sites. It includes 1,380 homes on the Waterloo Estate in Romford, whose first phase was approved on 17th June 2021, along with 197 completed homes at New Green in Rainham. Bridge Close in Romford proposes up to 1,070 homes alongside a primary school and health services.

The Romford Opportunity Area covers 308 hectares with London Plan capacity for 5,000 homes. Its former ice rink site was approved in 2023 for 972 units. Further south, Beam Park totals 3,119 units. The GLA's 2025 pen portrait expected its 520 unit Phase C to complete between early 2026 and late 2027.

Who decides

Who approves a fire strategy in Havering

Planning
London Borough of Havering (official source, opens in a new tab)
Its planning service reception is at The Liberty in Romford.
Building control
Havering Building Control (official source, opens in a new tab)
Council inspectors visit sites to check work against the regulations. Higher-risk buildings are approved by the Building Safety Regulator, not the council.
Fire station
Romford Fire Station (official source, opens in a new tab)
On Pettits Boulevard. LFB's borough page lists three more stations in Havering.
Heritage
Havering conservation areas (official source, opens in a new tab)
The 11 areas and the Article 4 directions in Gidea Park, Havering-atte-Bower and Cranham.

Local issues

What a Havering fire strategy has to deal with.

01

Grassland fire at Wennington

On 19th July 2022 fifteen fire engines tackled a fire on The Green in Wennington that affected around 40 hectares of grassland, farm buildings, houses and garages. LFB reported that almost 90 surrounding properties were evacuated. Homes beside open land need external fire spread and appliance access thought through together.

02

A data centre campus in East Havering

The East Havering proposal would provide up to 400,000 square metres of data centre space beside a 113 hectare Ecology Park. Consultation on a draft Local Development Order ran from 6th March to 12th April 2026. Data halls usually bring battery rooms, generators and gas suppression that a fire strategy has to separate and manage.

03

Tall buildings near Romford station

The Local Plan says tall buildings may be acceptable near Romford station subject to high quality design but calls them inappropriate within the Conservation Area. It also points proposals to views of the Grade II* Church of St Edward the Confessor and the Market Place crossroads. Height beside a busy station leaves little room for fire appliance access at ground level.

04

Homes in multiple occupation

Havering consulted from 21st August to 16th October 2026 on a borough wide Article 4 Direction that would require planning permission for all new HMOs. The council proposed that it take effect one year after the Direction is made. Shared houses still need fire separation between lettings and a protected stair whichever planning route applies.

Building types

The building types we see in Havering

Common questions

Fire strategy questions in Havering, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

The council said on 4th November 2026 that it was setting a timetable for a new Local Plan covering 2027 to 2042. It expected a scoping consultation to run from January 2027.

Guides

Guides worth reading first.

More in London

All locations

Fire strategy in Havering

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.