Uxbridge, Hayes, Ruislip and Heathrow
Heathrow Airport lies within Hillingdon, whose Local Plan steers high buildings to Uxbridge and Hayes because aviation safety limits heights across much of the borough. We write fire strategies for Hayes estate renewal, Uxbridge town centre schemes and listed buildings from the Great Barn at Harmondsworth to the Civic Centre.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Hillingdon buildings
The council's Local Plan scoping material says Heathrow supports over 75,000 jobs on site and 40,000 more through its supply chain. It also names the airport as a major source of adverse air quality in the borough. The London Plan 2021 sets Hillingdon a housing target of 1,083 homes a year.
Local Plan Part 2 was adopted at Full Council on 16th January 2020. A new plan is being prepared under the system introduced in March 2026. Its scoping consultation ran from 9th July to 21st August 2026 and the Gateway 1 self-assessment was published on 21st October 2026, with proposed submission consultation due in Q2 or Q3 2027.
Phase one of the Hayes estates renewal was completed on 30th January 2026, with Seabrook Court providing 80 upgraded homes on the Hayes Town Centre Estate. Across Avondale Drive and Hayes Town Centre the programme will create 740 new homes, half of them affordable. The borough has 31 conservation areas, including Harmondsworth Village, Longford Village, Uxbridge Lock and the two Botwell areas in Hayes named after Nestles and Thorn EMI.
Who decides
Who approves a fire strategy in Hillingdon
- Planning and building control
- Hillingdon Council (official source, opens in a new tab)
- Decides planning and runs its own building control surveyors. A higher-risk building goes to the Building Safety Regulator. A building notice cannot be used where the Fire Safety Order will apply.
- Fire station
- Hayes Fire Station (official source, opens in a new tab)
- On Shepiston Lane and home to one of LFB's eight 32 metre turntable ladders.
- Heritage
- Group Operations Room, RAF Uxbridge (official source, opens in a new tab)
- Historic England's Grade I entry for the Battle of Britain bunker, listed in December 2005.
- Hospital
- Redevelopment of Hillingdon Hospital (official source, opens in a new tab)
- The trust's page on the rebuild in Wave 1 of the New Hospital Programme.
Local issues
What a Hillingdon fire strategy has to deal with.
Height limits around Heathrow and Northolt
Policy DMHB 10 says much of the borough is constrained by height restrictions for aviation safety around Heathrow and RAF Northolt. High buildings are steered to Uxbridge and Hayes town centres. Where height is capped a large scheme grows in plan instead, which makes travel distances and appliance access the limits on the design.
A Wave 1 hospital rebuild
The government confirmed in January 2025 that Hillingdon Hospital would be redeveloped in Wave 1 of the New Hospital Programme, the only London hospital in that wave. The trust says the designs are being refreshed to Hospital 2.0. Hospitals rely on moving patients sideways into the next compartment, which fixes where the compartment lines fall in the clinical layout.
Energy plant near the airport
On the evening of 20th March 2025 a transformer containing insulating oil caught fire at a high-voltage substation near Heathrow. Around 150 people were evacuated and LFB used its 32 metre turntable ladders to apply foam and water. A strategy for a building close to energy plant has to allow for a fire that starts outside its own boundary.
HMOs in every ward
Full Council decided on 27th November 2025 to extend the HMO Article 4 direction to the whole borough. Before then a change from a house to an HMO for three or more unrelated sharers needed permission only in Brunel and Uxbridge South wards. Fire detection, fire doors and a safe route from each bedroom decide whether a proposed shared house can work.
Building types
The building types we see in Hillingdon
- Fire Strategy for Blocks of Flats and Apartments
The 740 homes of the Hayes estates and the fully affordable 95 home Yiewsley scheme
- Fire Strategy for Hospitals and Healthcare Buildings
Hillingdon Hospital and its Wave 1 rebuild
- Fire Strategy for Transport and Infrastructure
Uxbridge Underground Station and the Grade II Technical Block A at Heathrow on Cranford Lane
- Fire Strategy for Heritage Buildings and Conversions
The Great Barn at Harmondsworth, Swakeleys, the Market House and Hillingdon Civic Centre
What we deliver
Fire strategy services in Hillingdon.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read moreCommon questions
Fire strategy questions in Hillingdon, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsOn 17th September 2026 the council responded to the government's draft Heathrow Expansion Policy Strategy as Heathrow's host authority. It reaffirmed its longstanding opposition to expansion and proposed a fifth test, a Community Impact Test.
Guides
Guides worth reading first.
More in London
All locationsFire strategy in Hillingdon
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply