Bromley town centre, Orpington and Biggin Hill
Bromley has 47 conservation areas, owns the freehold of Biggin Hill Airport and in May 2025 began major works to restore the 30 Grade I listed dinosaur sculptures in Crystal Palace Park. We write fire strategies for Bromley's town centre schemes, council housing, suburban conversions and Grade I heritage.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Bromley buildings
Bromley's Local Plan, adopted on 16th January 2019, says much of the borough is not considered appropriate for tall buildings because of its established suburban character. The Bromley Town Centre Area Action Plan identifies potential sites for them and Policy 48 on the skyline protects views. The GLA gives the Bromley Opportunity Area, designated in 2016, potential for 2,500 new homes and 2,000 new jobs by 2041.
Crystal Palace Park received outline planning approval in March 2021 and major works began in May 2025. They cover the dinosaur sculptures and the Grade II Italian Terraces and were due to be completed by autumn 2026, funded by a £5m National Lottery Heritage Fund grant and £21.8m from the sale of land next to the park for affordable housing.
The council has committed to 1,000 new homes on council owned sites by 2030. At Poverest Road in Orpington it has planning approval for 42 new affordable homes in a £23.7m scheme. The council said implementation was subject to the Poverest Centre consultation, which ran from 7th September to 18th October 2026.
Who decides
Who approves a fire strategy in Bromley
- Planning
- Bromley Council (official source, opens in a new tab)
- The London Borough of Bromley is preparing a new Local Plan to a timetable that runs to adoption in September 2029.
- Building control
- Bromley Building Control (official source, opens in a new tab)
- Based at the Civic Centre in Churchill Court and limited to properties in the borough. The Building Safety Regulator takes any higher-risk building.
- Fire station
- Bromley Fire Station (official source, opens in a new tab)
- LFB's station at 4 South Street, BR1 1RH.
- Regeneration
- Crystal Palace Park regeneration plan (official source, opens in a new tab)
- The council's page for the park restoration and how it is funded.
Local issues
What a Bromley fire strategy has to deal with.
Building in a Grade I park
The prehistoric animal sculptures, geological formations and lead mine in Crystal Palace Park are listed Grade I. Any new pavilion or event structure there sits in that setting. Its fire strategy has to keep appliance routes open across the park and limit the chance of fire reaching the listed works.
Flats over shops in Orpington
In October 2026 LFB sent four engines to a fire in a takeaway shop with flats above on Orpington High Street. Six people left the flats. Homes over a commercial kitchen depend on fire separation from the shop and a way out that does not pass through it.
An airport the council owns
The council has owned the freehold of Biggin Hill Airport since 1974, with a 125 year lease from 1994 to Biggin Hill Airport Ltd. A group of three Fighter Dispersal Pens there is listed Grade II. Aviation buildings such as hangars need large compartments and fire service access across the airfield.
Shared houses in the suburbs
On 8th February 2022 the council confirmed an immediate HMO Article 4 Direction for Biggin Hill and Darwin wards and a non-immediate one for every other ward. Once permission is granted, a shared house needs fire doors to each bedroom and linked alarms suited to its size.
Building types
The building types we see in Bromley
- Fire Strategy for Mixed Use Developments
Flats over shops on Orpington High Street and sites in the Bromley Town Centre Area Action Plan
- Fire Strategy for Transport and Infrastructure
Biggin Hill Airport and the Grade II Bromley North Railway Station
- Fire Strategy for Heritage Buildings and Conversions
Down House in Downe, Bromley College on the High Street and the Crystal Palace dinosaurs
- Fire Strategy for Hospitals and Healthcare Buildings
Princess Royal University Hospital in Farnborough, Orpington Hospital and Beckenham Beacon
What we deliver
Fire strategy services in Bromley.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read moreCommon questions
Fire strategy questions in Bromley, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsThe timetable that took effect on 10th November 2026 plans a scoping consultation on 12th January 2027, submission on 6th March 2029 and adoption on 10th September 2029.
Guides
Guides worth reading first.
More in London
All locationsFire strategy in Bromley
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply