Bexleyheath, Erith and Belvedere

Bexley caps tall buildings at 45 metres, allows them only near Abbey Wood Village and Lower Belvedere and shares the Thamesmead and Abbey Wood Opportunity Area with Greenwich. We write fire strategies for Bexley's riverside housing, town centre conversions, industrial sites and Grade I houses.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Bexley buildings

Policy DP12 of the Local Plan adopted on 26th April 2023 treats buildings over 25 metres as tall. The only suitable locations are near Abbey Wood Village and Lower Belvedere, up to a maximum height of 45 metres. The GLA gives the Bexley Riverside Opportunity Area, designated in 2004 on the Thames Estuary growth corridor, potential for 6,000 new homes and 19,000 new jobs by 2041.

The Thamesmead and Abbey Wood Opportunity Area, shared with the Royal Borough of Greenwich, has potential for 8,000 new homes and 4,000 new jobs by 2041. Its 2020 planning framework identifies over 15,000 new homes and 8,000 new jobs with a DLR extension. The council's Economic Growth Strategy cites the business case for extending the Elizabeth line eastward and the Greater Erith Regeneration Programme.

Slade Green and Crayford Marshes are to receive up to £20m over 10 years through Pride in Place, with a neighbourhood board drawing up a 10 year regeneration plan. The council counts around 400 locally listed buildings and 23 conservation areas, among them Old Bexley and Red House Lane.

Who decides

Who approves a fire strategy in Bexley

Planning
Bexley Council (official source, opens in a new tab)
The London Borough of Bexley is assessing its 2023 Local Plan for review, with a new plan projected for submission in March 2030.
Building control
Bexley Building Control (official source, opens in a new tab)
The council's service adjusted its fees from 20th April 2026. Applications for higher-risk buildings go to the Building Safety Regulator.
Fire station
Bexley Fire Station (official source, opens in a new tab)
At 172 Erith Road in Bexleyheath, with Erith and Sidcup making up the borough's three LFB stations.
Heritage
Bexley conservation and heritage (official source, opens in a new tab)
The council's page on its conservation areas and locally listed buildings, including Crossness.

Local issues

What a Bexley fire strategy has to deal with.

01

A 45 metre ceiling

DP12 limits tall buildings to Abbey Wood Village and Lower Belvedere and stops them at 45 metres. Blocks above 25 metres are still well over 18 metres. Those holding two or more homes are therefore higher-risk buildings with their own regulatory route.

02

Commercial premises turned into homes

Article 4 Directions have removed the right to convert Class E premises to homes without permission in industrial locations since 8th January 2025 and in the 13 designated town centres since 10th December 2025. Where a conversion is approved, flats above or beside retained shops need fire separation and an escape route of their own.

03

Industrial heritage at Crossness

The Beam Engine House of the former Crossness Pumping Station on Bazalgette Way is listed Grade I. Any public use of a building like this has to plan escape around machinery and large open volumes where smoke can gather.

04

Jobs and homes side by side

The Bexley Riverside Opportunity Area is planned for 19,000 new jobs as well as 6,000 homes by 2041. Where industrial units sit close to new housing, each strategy has to consider fire spread across the boundary and appliance access along shared roads.

Building types

The building types we see in Bexley

Common questions

Fire strategy questions in Bexley, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Under the March 2025 Local Development Scheme the 2023 plan is being assessed from March 2025 to March 2027. Submission of a new plan is projected for March 2030.

Guides

Guides worth reading first.

More in London

All locations

Fire strategy in Bexley

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK