Ealing Broadway, Acton, Southall and Northolt
Ealing's New Local Plan is out for Main Modifications consultation until 21st December 2026 in a borough with almost 600 listed buildings and 30 conservation areas. We write fire strategies for estate renewal in South Acton, growth sites in Southall and the borough's listed studios, factories and houses.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Ealing buildings
The final draft New Local Plan for 2024 to 2039 was submitted to the government on 18th November 2024. Its Main Modifications consultation opened on 9th November 2026. The council says the new plan will replace the current Local Plan and the Southall Opportunity Area Planning Framework.
That framework aimed for at least 6,000 new homes and 3,000 new jobs across 10 development sites in a 520 hectare Opportunity Area over 20 years, accelerated by Crossrail. South Acton, the largest estate in the borough, is being rebuilt with nearly 3,500 new homes across 52 acres in 25 phases. Acton Gardens delivered 2,098 of them between 2012 and 2024.
In November 2026 the council's building control pages reported severe backlogs from customers who had returned after the failure of the private sector company they had been using. The council says it is acting as service provider of last resort and prioritising safety issues. It cannot guarantee response times.
Who decides
Who approves a fire strategy in Ealing
- Planning
- Ealing Council (official source, opens in a new tab)
- Plans the borough outside the area still covered by the Old Oak and Park Royal Development Corporation.
- Building control
- Ealing Building Control (official source, opens in a new tab)
- An in-house team at Perceval House on Uxbridge Road. Work on a higher-risk building is approved by the Building Safety Regulator instead.
- Fire station
- Southall Fire Station (official source, opens in a new tab)
- On Southall High Street and one of four LFB stations in the borough, alongside Acton, Ealing and Northolt.
- Local plan
- Ealing New Local Plan (official source, opens in a new tab)
- The council's page for the plan now at Main Modifications stage.
Local issues
What an Ealing fire strategy has to deal with.
Rebuilding South Acton in phases
South Acton is being rebuilt in 25 phases with a mix of private, affordable rent and shared ownership homes. Each new phase has to keep escape routes and appliance access open for the blocks already finished around it.
Tall buildings after Manor Road
On 29th October 2021 an inspector allowed a 20 storey building at Manor Road against the council and the Mayor. The council's tall buildings statement now reaffirms a plan-led approach and generally resists speculative tall buildings on unidentified sites. Fire safety for a tall scheme is best settled before the first application goes in.
Listed factories and studios
The main front block of the Hoover Factory on Western Avenue is listed Grade II*. Stages 2, 3A, 3B and 5 at Ealing Studios on Ealing Green are listed Grade II. Refitting either means threading compartment walls and escape routes through protected fabric.
HMOs across the borough
An immediate Article 4 direction has covered Perivale ward since 30th October 2024. A second direction brought the rest of the borough outside the OPDC area under the same control on 14th November 2025. A shared house still has to give every bedroom a protected way out to the front door.
Building types
The building types we see in Ealing
- Fire Strategy for Blocks of Flats and Apartments
South Acton's nearly 3,500 new homes and the Southall development sites
- Fire Strategy for Heritage Buildings and Conversions
Pitzhanger Manor House, Ealing Town Hall, the Hoover building and the Liberty Cinema in Southall
- Fire Strategy for Hospitals and Healthcare Buildings
Ealing Hospital on Uxbridge Road in Southall
- Fire Strategy for Schools and Education Buildings
The University of West London's main site on St Mary's Road
What we deliver
Fire strategy services in Ealing.

Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read moreCommon questions
Fire strategy questions in Ealing, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsCity Hall and the OPDC's own site still describe the corporation as Local Planning Authority for its area, which spans parts of Ealing, Brent and Hammersmith and Fulham. Ealing's borough HMO direction excludes that area.
Guides
Guides worth reading first.
More in London
All locationsFire strategy in Ealing
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply