Skip to content

Hackney Wick, Dalston, Shoreditch and Woodberry Down

Hackney took back planning for Hackney Wick and its section of Queen Elizabeth Olympic Park on 1st December 2024 and is rebuilding Woodberry Down as more than 5,500 homes. We write fire strategies for Here East and Hackney Wick, for estate renewal phases and for the borough's listed theatres and town halls.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Hackney buildings

Planning for Hackney Wick passed in 2004 to the London Thames Gateway Development Corporation, then to the Olympic Delivery Authority and then to the LLDC. The council began deciding new Hackney Wick applications on 1st September 2024 and the remaining powers followed on 1st December 2024. Hackney says the LLDC Local Plan and guidance cover that area until its own future Local Plan replaces them.

LP33 was adopted at Full Council on 22nd July 2020 with the exemption of its LLDC section. The first consultation on the next plan ran from 14th September to 2nd November 2026 and the council expects adoption in 2029. Two Article 4 directions made on 27th April 2023 remove Class E to C3 rights in the CAZ, the City Fringe and the town centres, with a third covering designated industrial areas.

Hackney designated its first conservation areas in 1969 at Clapton Square, Clapton Common, Clapton Pond and Clissold Park and now has 35. Woodberry Down replaces an estate of 2,000 homes with more than 5,500 over 20 years, at least 41 percent of them social rent or shared ownership. Its phase 4 received planning approval in May 2024.

Who decides

Who approves a fire strategy in Hackney

Planning
London Borough of Hackney (official source, opens in a new tab)
Its planning and building service handles every application in the borough, Hackney Wick now included.
Building control
Hackney Building Control (official source, opens in a new tab)
Gives fire safety advice, especially on high rise buildings. Since 1st October 2023 it has not been the building control body for residential blocks of at least 18 metres or seven storeys with two or more dwellings, which fall to the Building Safety Regulator.
Fire station
Homerton Fire Station (official source, opens in a new tab)
At 97 Homerton High Street. Shoreditch and Stoke Newington are the borough's other two stations.
LLDC policy
LLDC planning policy documents (official source, opens in a new tab)
Hackney's page on the LLDC plan and guidance it still applies in the former LLDC area.

Local issues

What a Hackney fire strategy has to deal with.

01

Tall by local standards

LP33 treats a building as taller if it is 50 percent above the prevailing height, significantly changes the skyline or reaches 30 metres. In an area of six storeys a nine storey building would count. Such a block can sit below the 18 metre line used in building regulations. The strategy then has to explain which thresholds apply and why.

02

Woodberry Down in phases

The regeneration partnership of the council, Berkeley Homes, Notting Hill Genesis, Woodberry Down Community Organisation and Manor House Development Trust works to plans approved in 2005 and updated in 2014. A scheme built over two decades needs each phase's strategy to fit what is already standing, including fire service routes that move as phases finish.

03

Roof fire on Dalston Lane

On 5th June 2024 the roof of a four storey residential block on Dalston Lane was destroyed, with 15 fire engines and around 100 firefighters attending. Two 32 metre turntable ladders were deployed. None of Hackney's three stations appears on LFB's aerial appliance list. Roof voids need cavity barriers to limit fire spread along them. Blocks also need hardstanding where an aerial coming from another station can set up.

04

Listed theatres and town halls

The Hackney Empire at 291 Mare Street is listed grade II*, with Hackney Town Hall and Shoreditch Town Hall at grade II. Historic auditoriums hold large audiences inside protected fabric. Exit widths, stage separation and alarm systems have to be worked into the listing.

Building types

The building types we see in Hackney

Common questions

Fire strategy questions in Hackney, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

It does for now. The council will replace it with a future Hackney Local Plan, which it expects to adopt in 2029.

Guides

Guides worth reading first.

More in London

All locations

Fire strategy in Hackney

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.