Skip to content

Hounslow, Brentford, Chiswick and Feltham

Hounslow's Grade I listings run from Chiswick House, Syon House and Osterley House to the Great Engine House at Kew Bridge, while its Golden Mile programme plans up to 14,000 homes along the Great West Road. We write fire strategies for towers on the A4 frontage, regeneration in Feltham, new homes in Brentford and the borough's country houses.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Hounslow buildings

The council launched Golden Mile London on 11th March 2026 as a 15 year programme for up to 14,000 homes, 25,000 jobs and £7.5bn of investment over four kilometres of the Great West Road. Its Planning Committee approved around 2,300 homes and 320,000 sq ft of commercial and community space at the former GSK headquarters, 980 Great West Road. The London Plan notes that the Great West Corridor inspired Art Deco architecture in the 1930s. The Gillette building on the Great West Road is listed Grade II.

The Hounslow Local Plan was adopted on 15th September 2015 and sets the framework to 2030. The draft Local Plan 2020 to 2041 was submitted on 23rd June 2025. Its hearings ran from 13th January to 2nd July 2026 and a consultation on post-hearing documents closed on 29th October 2026.

MOD Feltham is Hounslow's largest brownfield site and the centrepiece of the council's Future Feltham masterplan. In September 2025 the council, the MOD and the GLA said they intend to work together on it, with construction expected to start in 2028. West Middlesex University Hospital stands on Twickenham Road in Isleworth.

Who decides

Who approves a fire strategy in Hounslow

Planning
Hounslow Council (official source, opens in a new tab)
The planning authority for the whole borough, still working to its 2015 Local Plan.
Building control
Hounslow Building Control (official source, opens in a new tab)
The council's in-house service. The Building Safety Regulator, not the council, approves work on higher-risk buildings.
Fire station
Feltham Fire Station (official source, opens in a new tab)
On Faggs Road and one of three LFB stations in Hounslow, with Chiswick and Heston.
Local plan
Hounslow Local Plan review (official source, opens in a new tab)
Tracks the draft 2020 to 2041 plan through its examination.

Local issues

What a Hounslow fire strategy has to deal with.

01

Towers along the Golden Mile

Policy CC3 supports tall buildings along certain sections of the A4 Golden Mile frontage, placed so as not to create a wall of tall buildings. Each tower on the frontage needs its own firefighting core and an appliance route that does not depend on a neighbouring plot.

02

The 20 metre band on main streets

Outside the centres CC3 keeps buildings mostly at two to three storeys, under 10 metres, with limited scope for four to six storeys up to 20 metres on main streets. A block of flats at the top of that band can pass 18 metres. That puts it under the Building Safety Act's rules for higher-risk buildings and their gateway checks.

03

Grade I houses near Kew

CC3 asks tall buildings in Brentford to avoid harm to the Kew World Heritage Site, Syon Park and the Thames foreshore. Syon House, Osterley House and Boston Manor House are all listed Grade I. Fire upgrades in houses of that rank lean on early detection so that new walls and doors stay out of the historic rooms.

04

Controls on HMOs and office conversions

An HMO Article 4 direction has applied since 4th September 2023 across the borough, except open land, industrial areas, Chiswick Business Park, Bedfont Lakes Business Park and the Mogden Sewage Works. A Class MA direction in force from 22nd April 2025 covers town centres, industrial locations and key office locations. Offices turned into flats often start as open floors around a single stair. The new flats then have to be planned around a protected escape route.

Building types

The building types we see in Hounslow

Common questions

Fire strategy questions in Hounslow, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

The draft 2020 to 2041 plan finished its hearings on 2nd July 2026 and the Inspectors' report was awaited in November 2026. The plan adopted on 15th September 2015 remains the borough's framework in the meantime.

Guides

Guides worth reading first.

More in London

All locations

Fire strategy in Hounslow

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.