Wembley, Kilburn, Harlesden and Alperton
Brent counts any building over 30 metres as tall and directs such buildings to mapped Tall Building Zones, while the Old Oak and Park Royal Development Corporation plans about 200 hectares in the south of the borough. We write fire strategies for Wembley towers, Kilburn conversions, new homes in South Kilburn and Brent's listed buildings.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Brent buildings
The council describes Wembley as its largest growth area and says it is well on the way to realising its potential to deliver over 15,000 new homes and 10,000 new jobs. Paragraph 5.1.40 of the Local Plan treats the Wembley Growth Area and the London Plan Opportunity Area as the same place. Paragraph 3.3 records that the stadium arch is 315 metres wide and 133 metres high.
Brent formally adopted its Local Plan 2019 to 2041 in February 2022. Work on a replacement under the 2026 system began its 30 month process on 30th October 2026, after a September scoping consultation drew 352 online questionnaires and 26 email responses. The council's timetable puts submission in November 2028 and adoption in April 2029.
The South Kilburn programme is creating 2,400 new homes along with new and improved schools, health facilities and community spaces. Alperton was made a Housing Zone by the Mayor of London in 2015. Brent has 22 conservation areas, from Barn Hill and Buck Lane to Harlesden and Kensal Green. Its single Grade I building is the Old Parish Church of St Andrew.
Who decides
Who approves a fire strategy in Brent
- Planning
- Brent Council (official source, opens in a new tab)
- Decides applications for most of the borough. The OPDC remains planning authority for most land south of the North Circular and the West Coast Mainline.
- Building control
- Brent Building Control (official source, opens in a new tab)
- The council's own surveyors, based at Brent Civic Centre on Engineers Way. The Building Safety Regulator approves higher-risk buildings and can bring Brent's team into its multi-disciplinary team when required.
- Fire station
- Wembley Fire Station (official source, opens in a new tab)
- A Grade II listed station on Harrow Road that keeps one of LFB's eight 32 metre turntable ladders.
- Local plan
- Brent Local Plan 2019 to 2041 (official source, opens in a new tab)
- Policy BD2 sets the 30 metre threshold for tall buildings and points them to Tall Building Zones.
Local issues
What a Brent fire strategy has to deal with.
Towers in the Tall Building Zones
Policy BD2 treats anything over 30 metres as tall and the plan reckons a residential block of that height at about ten storeys. Every one of those blocks passes the 18 metre line for a higher-risk building. The fire strategy therefore has to be ready for the Building Safety Regulator's Gateway 2 review as well as for planning.
A listed arena at Wembley
Wembley Arena, the former Empire Pool on Arena Square, has been listed Grade II since 14th October 1976. Any refit has to fit exits, smoke clearance and alarm wiring around fabric that cannot simply be cut back.
The Gaumont State in Kilburn
The former Gaumont State at 195 to 199 Kilburn High Road, now Mecca Bingo, is listed Grade II*. Reusing a large former cinema auditorium means proving that a full house can leave through the existing stairs and foyers.
Family houses turned into HMOs
Brent confirmed an Article 4 direction on 3rd February 2022 that took effect on 1st November 2022. Turning a family house into a small HMO now needs planning permission in the areas its map covers. Each conversion still needs a protected stair and fire separation between the lettings.
Building types
The building types we see in Brent
- Fire Strategy for High-Rise Residential Buildings
Towers over 30 metres in Brent's mapped Tall Building Zones
- Fire Strategy for Blocks of Flats and Apartments
South Kilburn's 2,400 new homes and the Alperton Housing Zone
- Fire Strategy for Houses in Multiple Occupation
House conversions under the 2022 Article 4 direction
- Fire Strategy for Heritage Buildings and Conversions
Wembley Arena, the Gaumont State, Brent Town Hall and the Grade II* Sudbury Town station
What we deliver
Fire strategy services in Brent.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Gateway 2 and Gateway 3 Support
Higher-risk buildings, BSR submissions, UK wide
Read more
Fire Strategy Plans and Drawings
Annotated plans for every storey, UK wide
Read moreCommon questions
Fire strategy questions in Brent, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsThe Old Oak and Park Royal Development Corporation is still described as Local Planning Authority for most land south of the North Circular and the West Coast Mainline, including Park Royal. The Local Plan puts that area at roughly 200 hectares.
Guides
Guides worth reading first.
More in London
All locationsFire strategy in Brent
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply