Skip to content

Brent Cross, Colindale, Hendon and Finchley

Barnet Council opened Brent Cross West station on 10th December 2023 and is building Brent Cross Town, a 180-acre development of up to 6,700 homes, in partnership with Related Argent. We write fire strategies for new blocks in the borough's three opportunity areas, estate renewal in Colindale and conversions in its 16 conservation areas.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Barnet buildings

The council calls Brent Cross Cricklewood the biggest redevelopment and growth programme it has ever undertaken. Brent Cross Town is planned to bring 3 million sq ft of offices with space for 25,000 jobs alongside 50 acres of parks and playing fields. Brent Cross West was one of the first rail infrastructure projects delivered entirely by a local authority.

Grahame Park in Colindale is being rebuilt as roughly 4,000 homes. Notting Hill Genesis has completed 894 so far, 595 of them affordable. A further 2,088 homes were approved in March 2020 and the Secretary of State confirmed the estate's second compulsory purchase order on 17th July 2023.

The Barnet Local Plan, which runs from 2021 to 2036, was submitted on 26th November 2021 and adopted in 2025. It replaces the 2012 plan. Area Action Plans for Colindale and Mill Hill East remain part of the development plan, as do the North London Waste Plan and the West Finchley Neighbourhood Plan.

Who decides

Who approves a fire strategy in Barnet

Planning
Barnet Council (official source, opens in a new tab)
Sets policy through the Barnet Local Plan adopted in 2025 and decides applications across the borough.
Building control
Barnet Building Control Service (official source, opens in a new tab)
The council's in-house team, whose pages include a cladding and fire safety section. Approval for a higher-risk building rests with the Building Safety Regulator.
Fire station
Hendon Fire Station (official source, opens in a new tab)
On The Burroughs in Hendon. London Fire Brigade lists it with Barnet, Finchley and Mill Hill as the borough's four stations.
Regeneration
Brent Cross Cricklewood (official source, opens in a new tab)
The council's page for Brent Cross Town and Brent Cross West station.

Local issues

What a Barnet fire strategy has to deal with.

01

A 180-acre new town

Brent Cross Town covers 180 acres and is planned for up to 6,700 homes and 3 million sq ft of offices. Where a new block is occupied while buildings beside it are still under construction, its strategy has to work on its own with fire engine access planned for every stage.

02

Estate renewal in Colindale

The next stage at Grahame Park covers 2,088 homes and up to 5,950 sqm of flexible non-residential floorspace. Where demolition and building take place next to occupied homes, the strategy has to keep escape routes and fire service access open for those homes.

03

Listed civic and suburban buildings

Hendon Town Hall and the Royal Air Force Museum are listed Grade II and the Free Church in Hampstead Garden Suburb is Grade I. Ten of Barnet's 16 conservation areas have Article 4 directions. Detection and compartment upgrades in these places are designed around fabric that cannot be altered freely.

04

Small HMOs anywhere in the borough

Planning permission has been needed for a small HMO anywhere in Barnet since 29th May 2016, with an Additional Licensing scheme from 5th July 2016. A house shared by three to six people needs fire separation between lettings and a protected route to the front door.

Building types

The building types we see in Barnet

Common questions

Fire strategy questions in Barnet, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

The Barnet Local Plan covering 2021 to 2036 was adopted in 2025 after the Inspectors' Report found it sound and legally compliant. It took the place of the plan from 2012.

Guides

Guides worth reading first.

More in London

All locations

Fire strategy in Barnet

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.