Greenwich, Woolwich, Charlton and Thamesmead
Maritime Greenwich was designated a World Heritage Site in 1997, while at Kidbrooke 1,900 former Ferrier Estate properties are being replaced by 5,268 new homes. We write fire strategies for riverside housing, estate renewal plots, Grade I naval and royal buildings and the borough's hospital and campuses.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Greenwich buildings
The Royal Borough of Greenwich still works to a Core Strategy adopted on 30th July 2014. Consultation on its Regulation 19 draft Local Plan closed on 6th September 2026 and the council says it expects to submit the plan by the end of 2026. The draft sets a target of 49,630 new homes over the plan period.
The draft plan names Greenwich Peninsula, Woolwich, Charlton Riverside and Thamesmead and Abbey Wood as opportunity areas, along with Deptford Creek and Greenwich Riverside, which Lewisham's plan also names. It notes that the London Plan gives the borough's opportunity areas an indicative capacity of 25,500 jobs and 43,500 homes. Kidbrooke, with Berkeley Homes as development partner, is expected to cost over £1 billion and is scheduled to complete in 2031.
Riverside schemes listed by the council include New Capital Quay with 636 residential units and 667 units across Lovell's, Granite, Badcock's and Pipers wharves. The council says the Thamesmead and Abbey Wood opportunity area, whose framework was adopted in November 2020 with the Mayor, TfL and Bexley, could deliver up to 8,000 new homes. That rises to 15,000 homes if the DLR is extended.
Who decides
Who approves a fire strategy in Greenwich
- Planning
- Royal Borough of Greenwich (official source, opens in a new tab)
- Plans for the borough under the 2014 Core Strategy while its new Local Plan moves towards submission.
- Building control
- Royal Greenwich building control (official source, opens in a new tab)
- The council's building control service assesses full plans and inspects work on site. Approval for higher-risk buildings rests with the Building Safety Regulator.
- Fire station
- Greenwich Fire Station (official source, opens in a new tab)
- On Blisset Street, where LFB keeps a 32m turntable ladder.
- New local plan
- Drafting the new Royal Greenwich Local Plan (official source, opens in a new tab)
- The council's page on the Regulation 19 plan and its timetable.
Local issues
What a Greenwich fire strategy has to deal with.
Tall building thresholds in the draft plan
Draft Policy DH2 in the Regulation 19 plan would treat buildings over 45m as tall on Greenwich Peninsula and over 30m in Deptford Creek, Charlton, Woolwich, Thamesmead and parts of Abbey Wood and Kidbrooke Village. Elsewhere the threshold would be 18m, measured to the floor of the top storey. Under the Building Safety Act a block of two or more homes also becomes a higher-risk building at 18m or seven storeys.
Grade I buildings that draw visitors
The King Charles Quarters of the Royal Naval College, Flamsteed House at the Royal Observatory and the ship Cutty Sark are all listed Grade I. Visitor uses in fabric of this importance need escape, detection and any suppression designed around what cannot be altered.
Kidbrooke at scale
The 5,268 homes at Kidbrooke will be 35 percent affordable and are being delivered in phases with Berkeley Homes. Across that many buildings a consistent approach keeps evacuation policy, alarm systems and firefighting access the same from plot to plot.
Restaurants below flats
In October 2026 LFB sent six engines to a fire in a ground floor restaurant on Sidcup Road, Eltham, with two floors of flats above. Commercial kitchens under homes need compartment floors, protected extract ductwork and a residents' escape route that does not pass through the business.
Building types
The building types we see in Greenwich
- Fire Strategy for Heritage Buildings and Conversions
The Royal Arsenal Brass Foundry, the Great Hall of Eltham Palace and Woolwich Town Hall
- Fire Strategy for Blocks of Flats and Apartments
New Capital Quay, the Greenwich riverside wharves and Kidbrooke
- Fire Strategy for Hospitals and Healthcare Buildings
Queen Elizabeth Hospital on Stadium Road
- Fire Strategy for Schools and Education Buildings
The University of Greenwich campuses beside Greenwich Park and at Avery Hill in Eltham
What we deliver
Fire strategy services in Greenwich.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Gateway 2 and Gateway 3 Support
Higher-risk buildings, BSR submissions, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read moreCommon questions
Fire strategy questions in Greenwich, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsThe Core Strategy adopted on 30th July 2014 is still the adopted plan. The council has also published a note on the weight it gives to draft Policy H6, which deals with HMOs.
Guides
Guides worth reading first.
More in London
All locationsFire strategy in Greenwich
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply