Overview

Fire strategy for Harrow buildings

The Harrow Local Plan provides for 802 homes a year and 16,040 homes over its period. The council reports a five-year housing land supply of 6.5 years. Its supplementary documents include a Tall Building SPD, the Harrow Met Centre masterplan and the Edgware Growth Area.

Poets Corner, on the former Harrow Civic Centre site, will deliver 1,058 homes and received a resolution to grant permission in October 2025, subject to legal agreements. Byron Quarter's first phase with Wates Residential has 149 homes, including a five-storey block of 44 private flats. At Grange Farm in South Harrow, 89 homes were completed in October 2023 and Phase 2A of 45 homes is due to finish in late 2027.

The Harrow and Wealdstone Opportunity Area covers 177 ha with London Plan capacity for 5,000 homes and 1,000 jobs. The council's regeneration brochure notes that Harrow is home to the Royal National Orthopaedic Hospital on Brockley Hill in Stanmore and to a University of Westminster campus.

Who decides

Who approves a fire strategy in Harrow

Planning
Harrow Council (official source, opens in a new tab)
Decides applications against the plan it adopted in March 2026 and its Tall Building SPD.
Building control
Harrow Building Control (official source, opens in a new tab)
Council surveyors check work as it is built. The Building Safety Regulator is the approving body for any higher-risk building.
Fire station
Harrow Fire Station (official source, opens in a new tab)
At 500 Pinner Road. The Brigade's other station in the borough is Stanmore on Honeypot Lane.
Local plan
Harrow Local Plan (official source, opens in a new tab)
The adopted plan for 2021 to 2041, with Policy GR4 on tall buildings and its fire safety text.

Local issues

What a Harrow fire strategy has to deal with.

01

Two staircases in tall buildings

Policy GR4 treats any building of 7 storeys or 21m as tall and directs it to the zones in the Harrow and Wealdstone Opportunity Area. The supporting text expects two staircases for means of escape. It also requires a fire safety assessment, checked by an independent or suitably qualified fire assessor at the applicant's expense.

02

A fire in a nine-storey block

A fire on the fourth floor of a nine-storey block on Headstone Road on 9th November 2026 led to around 42 people being evacuated. London Fire Brigade believed unsafe use of incense sticks was the cause. Blocks of this height depend on compartmentation to hold a fire in one flat and on a stair that stays clear for those who leave.

03

HMO control across the whole borough

Since 12th June 2026 turning any house in Harrow into a small HMO has needed planning permission, assessed against Policy HO10. A shared house needs fire separation between rooms and an escape route that every occupant can use.

04

Grade I school and manor buildings

The Old Schools at Harrow School and Headstone Manor are listed Grade I, while the Headstone barn and the Central Entrance Block at Bentley Priory are Grade II*. Harrow has 30 conservation areas. Harrow Park and Harrow on the Hill Village also carry Article 4 directions.

Building types

The building types we see in Harrow

Common questions

Fire strategy questions in Harrow, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Policy GR4 of the 2026 Local Plan sets the threshold at 7 storeys or 21m from ground level to the highest point. A fire safety assessment must support every tall building application.

Guides

Guides worth reading first.

More in London

All locations

Fire strategy in Harrow

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK