Skip to content

Wimbledon, Mitcham and Morden

Merton's Local Plan of 20th November 2024 counts a building as tall from 21 metres while Wimbledon fire station keeps one of London Fire Brigade's three 64 metre turntable ladders. We write fire strategies for Merton's estate renewal blocks, town centre flats, sports venues and listed houses.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Merton buildings

Policy D12.6 accepts tall buildings only within the Strategic Heights Diagrams for the Morden Regeneration Zone and Wimbledon Town Centre, on the Eastfields and High Path estates and on listed site allocations. The policy names Britannia Point in Colliers Wood and Glebe Court in Mitcham as examples. The GLA gives the Wimbledon, Colliers Wood and South Wimbledon Opportunity Area, designated in 2021, potential for 5,000 new homes and 6,000 new jobs by 2041.

The Estates Local Plan for Clarion Housing Group's Eastfields, High Path and Ravensbury estates was adopted on 7th February 2018. Future Wimbledon, the town centre SPD, followed on 18th November 2020. Through Remaking Morden the council says it will be seeking a private sector development partner and its FAQ says there are no detailed development plans yet.

The Deputy Mayor for Planning approved the All England Lawn Tennis Club's called in application for Wimbledon Park on 27th September 2024, including 38 more grass courts and a new Show Court. During the annual Championships a marquee on public or private land in north Wimbledon needs planning permission. The council's building control team says it supports safety at the All England Lawn Tennis Club and AFC Wimbledon.

Who decides

Who approves a fire strategy in Merton

Planning
Merton Council (official source, opens in a new tab)
The London Borough of Merton works to the Local Plan it adopted in November 2024, which replaced its 2014 and 2011 plans.
Building control
Merton Building Control (official source, opens in a new tab)
A not for profit council service. Higher-risk buildings sit with the Building Safety Regulator rather than the council.
Fire station
Wimbledon Fire Station (official source, opens in a new tab)
Station H34 at 87 Kingston Road, base for one of LFB's three 64 metre turntable ladders.
Regeneration
Remaking Morden (official source, opens in a new tab)
The council's page on its search for a private sector partner to regenerate Morden.

Local issues

What a Merton fire strategy has to deal with.

01

Tall from 21 metres

Merton defines a tall building as at least 21 metres from ground level to the top of the uppermost storey. A residential block of that height is also over the 18 metre line for a higher-risk building. Its fire strategy has to be ready for the Building Safety Regulator at Gateway 2.

02

Estate rebuilds at High Path and Eastfields

Clarion's three estates have their own Estates Local Plan. Eastfields and High Path are also named locations for tall buildings. Each phase of an estate rebuild has to hand over with working escape routes and clear appliance access through land that is still under construction.

03

Championship crowds and marquees

The approved Wimbledon Park scheme includes 38 more grass courts and a new Show Court. A show court and the marquees that need permission during the Championships both gather large crowds. Exit widths, travel distances and the gaps between temporary structures have to be worked out for those numbers.

04

A listed fire station and a Grade I house

Wimbledon's former fire station on Queens Road, dated 1904 by Charles Hanlet Cooper, is listed Grade II. Eagle House in Mitcham is Grade I and The Canons, built in the 1680s, is Grade II*. Reusing buildings like these means placing detection and protected routes around historic plan forms.

Building types

The building types we see in Merton

Common questions

Fire strategy questions in Merton, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

An Article 4 Direction has covered seven wards since 17th November 2022 and was confirmed on 19th April 2023. A second direction for the remaining 13 wards began on 24th March 2026, with comments invited by 19th June 2026.

Guides

Guides worth reading first.

More in London

All locations

Fire strategy in Merton

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.