Croydon town centre, South Norwood and New Addington
Croydon's 2018 Local Plan anticipates towers taller than 40 storeys, while its town centre still holds the Grade I Old Palace and Whitgift Hospital. We write fire strategies for Croydon's tall residential blocks, estate renewal schemes, shared houses and listed civic buildings.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Croydon buildings
The GLA gives the Croydon Opportunity Area, designated in 2004, potential for 14,500 new homes and 10,500 new jobs by 2041. Local Plan policy SP4.5 encourages tall buildings only there, in parts of District Centres and around well connected public transport interchanges. Policy DM15 adds that a development with a building taller than 40 storeys must include amenity space open to the public as well as to residents.
In January 2026 the council gave final planning permission for up to 340 new homes on the Regina Road estate in South Norwood, backed by a £54m grant. The scheme replaces three 1960s tower blocks after a residents' ballot in 2023. On 25th March 2026 the council said Lovell would soon start on the first block, 30 homes across six storeys.
College Green, a new space between Fairfield Halls and Croydon College, gained planning permission in July 2026 within the Mayor's Town Centre Regeneration Programme, alongside Minster Green and Surrey Street. The council says the government intervention, with Best Value Commissioners appointed in July 2025, is in place until 20th July 2027 and that it is releasing assets for redevelopment in three tranches.
Who decides
Who approves a fire strategy in Croydon
- Planning
- Croydon Council (official source, opens in a new tab)
- The London Borough of Croydon determines applications across the borough against the Croydon Local Plan 2018.
- Building control
- Croydon Building Control (official source, opens in a new tab)
- The council keeps its own building control team. Work on a higher-risk building is checked by the Building Safety Regulator instead.
- Fire station
- Croydon Fire Station (official source, opens in a new tab)
- At 90 Old Town, one of five stations LFB lists for the borough.
- Local plan
- Croydon Local Plan Review examination (official source, opens in a new tab)
- In letter IN11 the Inspectorate said the review was ready to progress to the next stage, with main modifications to go to a six week public consultation.
Local issues
What a Croydon fire strategy has to deal with.
Public space in very tall towers
Policy DM15 expects any Croydon scheme with a building above 40 storeys to open amenity space to the public as well as residents. Visitors who do not know the building change the escape and management assumptions. The strategy has to show how they get out and how staff control the space in a fire.
Phased renewal at Regina Road
Regina Road replaces three 1960s towers with up to 340 homes, beginning with a six storey block of 30. A scheme delivered block by block needs a fire strategy for each completed building and for the site around it while later blocks go up.
Shared houses anywhere in the borough
Croydon's small HMO Article 4 Direction came into force on 28th January 2020 and applies to the whole borough. Converting a family house for sharers therefore needs planning permission. The layout then has to give each letting room a protected route out and suitable fire detection.
Historic and civic fabric
Whitgift Hospital on North End and the Great Hall of the Old Palace are listed Grade I. The Municipal Buildings on Katharine Street, with the clock tower, library and Corn Exchange, are Grade II. Bringing such fabric up to date for public use means fitting compartmentation and detection around features that cannot simply be replaced.
Building types
The building types we see in Croydon
- Fire Strategy for High-Rise Residential Buildings
Towers in the Croydon Opportunity Area, where the Local Plan looks beyond 40 storeys
- Fire Strategy for Blocks of Flats and Apartments
The Regina Road estate rebuild in South Norwood
- Fire Strategy for Heritage Buildings and Conversions
Whitgift Hospital, the Old Palace, the Parish Church of St John the Baptist and Airport House on Purley Way
- Fire Strategy for Hospitals and Healthcare Buildings
Croydon University Hospital on London Road, with more than 500 beds
What we deliver
Fire strategy services in Croydon.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Gateway 2 and Gateway 3 Support
Higher-risk buildings, BSR submissions, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read moreCommon questions
Fire strategy questions in Croydon, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsThe Croydon Local Plan 2018 was adopted on 27th February 2018. Its review to 2040 was submitted on 29th November 2024 and in January 2026 the council reported that the Inspectorate found it ready to move to the next stage.
Guides
Guides worth reading first.
More in London
All locationsFire strategy in Croydon
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply