Haringey approved a 61,000-seat stadium for Tottenham Hotspur in 2016 and is rebuilding parts of Broadwater Farm, a 1970s estate of more than 1,000 homes. We write fire strategies for estate renewal, flats above Wood Green's shops and the borough's listed halls.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Haringey buildings

The stadium permission issued on 15th April 2016 allowed 61,000 seats instead of 56,250 and 579 flats on the wider site instead of 285. It also covers a 180-bedroom hotel, an extreme sports centre and a community medical centre. Listed building consent covered works to Warmington House, which is Grade II.

Broadwater Farm is an 18-hectare council estate inspired by Le Corbusier and completed in the early 1970s. In the 2022 ballot 85 percent of voters backed the plans on a 55 percent turnout. The council plans 302 new council homes at council rents. Phase 1 construction began on the former Moselle School site in February 2025.

The adopted Local Plan dates from 2017 and includes the Tottenham Area Action Plan. More than 10,000 individuals and groups responded to the draft new plan between 10th October and 19th December 2025. The draft notes that Haringey will be London Borough of Culture in 2027.

Who decides

Who approves a fire strategy in Haringey

Planning
Haringey Council (official source, opens in a new tab)
Works from the 2017 Local Plan and the Tottenham Area Action Plan while a new plan is prepared.
Building control
Haringey Building Control (official source, opens in a new tab)
Based at Alexandra House in Wood Green and also responsible for sports ground safety certificates. A higher-risk building is approved by the Building Safety Regulator rather than by this team.
Fire station
Hornsey and Tottenham fire stations (official source, opens in a new tab)
The borough's two London Fire Brigade stations, on Park Avenue South and St Loys Road.
Regeneration
Broadwater Farm estate (official source, opens in a new tab)
The council's pages on the ballot, the fire safety works and the demolition of Tangmere.

Local issues

What a Haringey fire strategy has to deal with.

01

Crowds beside homes and a hotel

The Tottenham Hotspur stadium was consented for 61,000 seats and the same permission includes flats, a hotel and a medical centre on the same wider site. A mixed site of this size needs crowd escape, separation between uses and fire service access designed as one scheme.

02

Fire doors and demolition at Broadwater Farm

New flat and communal fire doors were fitted at Broadwater Farm between spring 2024 and March 2025. Final demolition of Tangmere began in late March 2026 after a pause to divert UKPN cables. The council plans the same works for Rochford and Martlesham in a pilot refurbishment starting in 2027.

03

Flats above shops in Wood Green

Eight fire engines and about 60 firefighters went to a flat fire above a shop on High Road, Wood Green, on 4th August 2026. One of the Brigade's 32-metre turntable ladders was used there as an observation platform. Homes over shops need fire separation from the shop and an escape route that does not pass through it.

04

Town halls, a castle and a palace

Alexandra Palace and Tottenham Town Hall are listed Grade II, Hornsey Town Hall is Grade II* and Bruce Castle is Grade I. New uses in buildings of this kind call for escape and detection planned around fixed historic layouts.

Building types

The building types we see in Haringey

Common questions

Fire strategy questions in Haringey, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

In November 2026 the council's page still put the Proposed Submission plan in the second half of 2026. The March 2025 timetable had aimed for that stage in May to June 2026 and adoption in February 2027.

Guides

Guides worth reading first.

More in London

All locations

Fire strategy in Haringey

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.