Wandsworth confines tall buildings to coded zones on its Local Plan maps and shares with Lambeth the Vauxhall, Nine Elms and Battersea opportunity area, which the GLA says could bring 18,500 new homes by 2041. We write fire strategies for Nine Elms apartment buildings, Wandsworth's regenerated estates and its listed town halls.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Wandsworth buildings
The council calls Nine Elms on the South Bank central London's biggest regeneration area and describes a multi billion pound programme turning a largely industrial district into a residential and business quarter. Battersea Power Station, the new United States Embassy and New Covent Garden Market all lie within it. The power station has been listed Grade II* since 14th October 1980.
The Wandsworth Local Plan was adopted on 19th July 2023 and a partial review followed on 4th March 2026, replacing six housing policies including those on student accommodation, build to rent and specialist housing for vulnerable and older people. Under Policy LP4 a building of 7 storeys or 21 metres, whichever is lower, counts as tall. Such buildings are allowed only in the tall building zones mapped at Appendix 2.
Clapham Junction was designated an opportunity area in 2021 with potential for 2,500 new homes by 2041. A masterplan partnership of the council, Network Rail, the GLA, TfL and the owners of the ShopStop mall reported its first stage to Cabinet on 3rd November 2025 with three options for a new pedestrian crossing of the station. St George's Hospital in Tooting is one of the city's four major trauma centres and shares its campus with St George's, University of London.
Who decides
Who approves a fire strategy in Wandsworth
- Planning
- Wandsworth Council (official source, opens in a new tab)
- Determines applications from Putney to Nine Elms under the Local Plan for 2023 to 2038.
- Building control
- Wandsworth Building Control (official source, opens in a new tab)
- Council surveyors who use the full plans route for shops, offices, factories, hotels and boarding houses so they can consult the fire brigade. Plans for any higher-risk building bypass the council and are checked by the Building Safety Regulator.
- Fire station
- Tooting Fire Station (official source, opens in a new tab)
- One of three LFB stations in the borough, working from 91 Trinity Road in a building listed Grade II since 14th December 1982.
- Nine Elms
- About Nine Elms (official source, opens in a new tab)
- The council's page on the regeneration area around Battersea Power Station.
Local issues
What a Wandsworth fire strategy has to deal with.
Coded tall building zones
LP4 sends every tall building to a coded zone such as TB-G1d-01 and tests it against London Plan Policy D9. With the trigger at 7 storeys or 21 metres, many of these blocks also pass the 18 metre height of a higher-risk building. The fire strategy then answers to the Building Safety Regulator as well as to the zone's design tests.
Winstanley and York Road in phases
The Winstanley and York Road scheme has delivered 265 homes so far and the masterplan page puts the total at around 2,500. The council appointed a new architect team for the remaining phases in January 2026 and says it is reviewing the plans, with more information due after a Cabinet meeting in December 2026. Phased construction needs escape routes, fire mains and engine access that work at every stage rather than only at the end.
The Alton Estate
In the Alton regeneration ballot that closed on 16th October 2025, 82.4 percent of those voting said yes. The council lists the estate's twentieth century social housing among its conservation areas. New work there has to meet current escape and compartment standards without losing the character the designation protects.
Basements under commercial premises
On 19th October 2026 four engines and around 25 firefighters dealt with a basement fire in a commercial property on Balham New Road. LFB believed a fault in an extractor fan caused it. Basements need their own smoke venting and a firefighting route that does not depend on the floor above.
Building types
The building types we see in Wandsworth
- Fire Strategy for High-Rise Residential Buildings
Apartment buildings at Nine Elms and in the LP4 tall building zones
- Fire Strategy for Blocks of Flats and Apartments
The Winstanley and York Road estates and the Alton Estate in Roehampton
- Fire Strategy for Heritage Buildings and Conversions
Battersea Power Station, Battersea Arts Centre, Wandsworth Town Hall and the Grade I Church of St Mary
- Fire Strategy for Hospitals and Healthcare Buildings
St George's Hospital in Tooting and Queen Mary's Hospital in Roehampton
What we deliver
Fire strategy services in Wandsworth.

Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Gateway 2 and Gateway 3 Support
Higher-risk buildings, BSR submissions, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read moreCommon questions
Fire strategy questions in Wandsworth, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsOnly in the tall building zones shown on the maps at Appendix 2 of the Local Plan. Policy LP4 treats a building as tall once it reaches the lower of 7 storeys or 21 metres.
Guides
Guides worth reading first.
More in London
All locationsFire strategy in Wandsworth
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply