Chelsea, South Kensington, Earls Court and North Kensington
Kensington and Chelsea writes fire safety into its own Local Plan through Policy CD16, while nearly three quarters of the borough sits within 38 conservation areas. We write fire strategies for the Royal Borough's listed buildings, its hotels and the new homes planned at Earls Court and Kensal Canalside.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Kensington and Chelsea buildings
In the government's words, the fire at Grenfell Tower on 14th June 2017 that took 72 lives was a national tragedy. The council's Local Plan 2024, adopted on 24th July 2024, includes Policy CD16 on fire safety. It requires a Fire Statement for major development and for all relevant buildings under Planning Gateway One. Tall buildings of 30 metres or more, measured from ground level to the floor of the topmost storey, need a Qualitative Design Review panel report with the application.
Policy CD8 uses two tall building thresholds tied to location, one at 21 metres and one at 30 metres, which the plan equates to roughly 7 and 10 storeys. Tall buildings are acceptable only where Figure 6.4 marks a location as suitable and only at the heights set in the site allocations.
The GLA gives the Kensal Canalside opportunity area, designated in 2011, potential for 3,500 new homes and 2,000 new jobs by 2041. On the former Kensal Gas Works, an application from St William Homes received on 13th June 2025 includes approximately 241 homes in its detailed component and is referable to the Mayor of London.
Who decides
Who approves a fire strategy in Kensington and Chelsea
- Planning
- Royal Borough of Kensington and Chelsea (official source, opens in a new tab)
- Decides applications under the Local Plan 2024. Referable schemes such as the Kensal Gas Works application also go to the Mayor of London.
- Building control
- RBKC Building Control (official source, opens in a new tab)
- Works inside the borough and, through the Partner Authority Scheme, on projects across England and Wales. Over 50 companies have partnered with it. Higher-risk work in the Royal Borough leaves its remit for the Building Safety Regulator.
- Fire station
- Chelsea Fire Station (official source, opens in a new tab)
- At 264 Kings Road. Crews from Chelsea and Kensington were among those at the Knightsbridge Road hotel fire on 9th October 2026.
- Local Plan
- Local Plan 2024 (official source, opens in a new tab)
- The council's page for the plan that holds Policy CD16 on fire safety and Policy CD8 on tall buildings.
Local issues
What a Kensington and Chelsea fire strategy has to deal with.
A fire expert review panel
Paragraph 6.141 of the Local Plan says the council will set up a review panel of fire safety experts to assess the escape proposals in each Qualitative Design Review, with particular reference to the number of stairs. The applicant meets the panel's costs. Stair numbers and escape design are best settled before the application goes in.
Earls Court across the boundary
The Royal Borough's part of Earls Court pairs a detailed element of 310 homes with an outline for up to 130,000 square metres of residential floorspace. Hammersmith and Fulham's page records that the Royal Borough's committee resolved to grant on 16th December 2025, subject to referral to the Mayor of London and a Section 106 agreement. The Royal Borough's own page still showed the decision as to be confirmed in November 2026. A scheme split between outline and detailed phases needs a fire strategy that sets rules for later plots as well as the first buildings.
Hotel terraces and external ducting
On 9th October 2026 a fire at a hotel on Knightsbridge Road affected the external ducting of a first floor roof terrace and around 34 people were evacuated. LFB believed smoking materials were the cause. Ductwork on the outside of a building can carry fire past the compartment walls inside it, which is why terraces and external services belong in the strategy.
Basements beneath protected streets
A borough-wide Article 4 direction has covered basement development since 28th April 2016. Nearly three quarters of the borough lies in conservation areas. A basement under a protected house needs its own protected route out and smoke control that leaves the historic frontage alone.
Building types
The building types we see in Kensington and Chelsea
- Fire Strategy for Heritage Buildings and Conversions
Kensington Palace, the Natural History Museum, the Royal Court Theatre and Chelsea Town Hall
- Fire Strategy for Retail and Leisure Buildings
Harrods on Brompton Road, listed Grade II*
- Fire Strategy for Blocks of Flats and Apartments
Earls Court, the former Kensal Gas Works and refurbishment on the Lancaster West Estate
- Fire Strategy for Schools and Education Buildings
Imperial College London's main campus at South Kensington
What we deliver
Fire strategy services in Kensington and Chelsea.

Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Gateway 2 and Gateway 3 Support
Higher-risk buildings, BSR submissions, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read moreCommon questions
Fire strategy questions in Kensington and Chelsea, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsMajor development and all relevant buildings under Planning Gateway One need a Fire Statement. Tall buildings of 30 metres or more, measured to the floor of the topmost storey, need a Qualitative Design Review panel report. Minor or other applications need a Planning Fire Safety Strategy.
Guides
Guides worth reading first.
More in London
All locationsFire strategy in Kensington and Chelsea
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply