Hammersmith, Fulham, Shepherds Bush and White City
Hammersmith and Fulham holds the larger share of the Earls Court scheme, with up to 2,500 of around 3,900 homes, while its northern part falls to the Old Oak and Park Royal Development Corporation for planning. We write fire strategies for Earls Court plots, White City's creative and research buildings and listed venues such as Olympia.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Hammersmith and Fulham buildings
The two Earls Court applications together seek up to 712,031 square metres of floorspace, with up to 465,973 square metres of it on a 10 hectare site in Hammersmith and Fulham. The scheme includes up to 250,000 square metres of offices. The borough's planning committee considered its own application on 25th November 2025 and resolved to grant subject to referral to the Mayor of London and a Section 106 agreement.
The Old Oak and Park Royal Development Corporation took over planning powers on 1st April 2015 for an area that takes in land in Ealing, Brent and Hammersmith and Fulham. The council keeps responsibility for day to day services there. Its page says the area could provide up to 26,500 new homes and up to 55,000 jobs.
The White City Regeneration Area covers 110 hectares, taking in Shepherds Bush Town Centre, the BBC and Queens Park Rangers Football Club, with a focus on creative industries and bio-medical research. The GLA gives the White City opportunity area potential for 7,000 new homes and 2,000 new jobs by 2041. The council has designated 44 conservation areas covering almost half the borough.
Who decides
Who approves a fire strategy in Hammersmith and Fulham
- Planning
- Hammersmith and Fulham Council (official source, opens in a new tab)
- Decides applications across most of the borough, Earls Court included. Large applications in the OPDC area in the north go to the development corporation instead.
- Building control
- Hammersmith and Fulham Building Control (official source, opens in a new tab)
- Consults the London Fire Authority on full plans for offices, shops, railway premises and factories. It also arranges fire risk assessments through accredited assessors. The Building Safety Regulator is the building control authority for any higher-risk block in the borough.
- Fire station
- Hammersmith Fire Station (official source, opens in a new tab)
- At 190 to 192 Shepherd's Bush Road. Fulham station on Fulham Road is the borough's other LFB station.
- Earls Court
- Earls Court development (official source, opens in a new tab)
- The council's page with the combined floorspace figures and the October 2026 amendments.
Local issues
What a Hammersmith and Fulham fire strategy has to deal with.
Earls Court plots moving between consents
An applicant's letter of 13th October 2026 proposes moving plot WB05-T1 into the outline part of the scheme as Development Zone H[O]. The maximum floorspace in the borough stays at 465,973 square metres. When plots shift from detailed to outline consent, the site-wide fire strategy has to fix the access roads, water supplies and stair principles that later reserved matters must follow.
Two planning authorities
The council's borough-wide basement Article 4 direction, in force since 26th April 2018, stops at the OPDC boundary. North of that line the development corporation decides large applications under the Local Plan it adopted in 2022. A fire statement has to answer to whichever body is actually deciding the scheme.
Exhibition halls at Olympia
Olympia's Grand Hall and Pillar Hall on Hammersmith Road have been listed Grade II* since 25th February 2003. Each exhibition layout changes how visitors reach the exits. The strategy sets limits on stand layout, smoke clearance and occupant numbers that every event can work within.
Hospitals that stay open
Charing Cross Hospital on Fulham Palace Road runs a 24/7 accident and emergency department and hosts the hyper acute stroke unit for the region. Hammersmith Hospital on Du Cane Road holds the regional specialist heart attack centre. Works in either rely on progressive horizontal evacuation, moving patients into a neighbouring compartment rather than out of the building.
Building types
The building types we see in Hammersmith and Fulham
- Fire Strategy for Mixed Use Developments
The Earls Court plots and the White City Regeneration Area
- Fire Strategy for Heritage Buildings and Conversions
Fulham Palace, Fulham and Hammersmith town halls and BBC Television Centre
- Fire Strategy for Retail and Leisure Buildings
Olympia and the Shepherds Bush Empire
- Fire Strategy for Hospitals and Healthcare Buildings
Charing Cross Hospital and Hammersmith Hospital
What we deliver
Fire strategy services in Hammersmith and Fulham.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read moreCommon questions
Fire strategy questions in Hammersmith and Fulham, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsThe council decides most of them. In the north, planning powers have belonged to the Old Oak and Park Royal Development Corporation since 1st April 2015.
Guides
Guides worth reading first.
More in London
All locationsFire strategy in Hammersmith and Fulham
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply