Services
Fire strategy is a thread that runs from the planning application to the handover pack and the safety case. We cover the whole of it so nothing is designed twice or lost between consultants.

Fire strategy documents
The documents a building is designed, approved and handed over on.
Fire Strategy Reports
A fire strategy report is the master plan for how a building is designed, built and managed to be safe from fire. It is the thinking behind every fire safety decision, from escape routes and compartmentation to alarms, smoke control and fire service access. We produce clear, building specific fire strategies across the UK, backed by in-house fire engineering.
Retrospective Fire Strategy
Many existing buildings have no usable fire strategy. They pre date modern regulations, were altered without one or simply lost the paperwork. A retrospective fire strategy reviews the building as it stands, documents how it manages fire risk and sets out where it falls short of current expectations.
Fire Strategy Plans and Drawings
Fire strategy plans are the visual record of every key fire safety decision in your building. They translate the written report into annotated floor plans that planners, Building Control, contractors and the Building Safety Regulator can read at a glance.
Fire Strategy Review and Peer Review
A fire strategy is only as good as the thinking behind it. We review strategies written by others, for developers who inherit one, approvers who have to accept one, purchasers and insurers who have to rely on one and design teams who want to know the case will hold before it is submitted.
Fire engineering
Performance based analysis where the guidance does not fit the building.
Fire Engineering
We deliver fire engineering in-house, not outsourced to a third party. We apply science and engineering principles to design buildings that are safe, compliant and practical to build, from concept design through to handover and into occupation, anywhere in the UK.
Smoke Control and Evacuation Modelling
Smoke, not flame, is what stops people leaving a building in time. Smoke control and evacuation modelling let you prove that the escape routes in your design stay usable for long enough. We carry out that work in-house for clients across the UK.
Building Safety Act and handover
Planning, gateways, safety cases and the information that follows the building.
Planning Fire Statements and Gateway 1
Since 1st August 2021 a planning application for a relevant high-rise residential building must be accompanied by a fire statement on the form prescribed by the Secretary of State. We prepare Gateway 1 fire statements and the independent fire strategies that London Plan Policy D12 calls for, on schemes UK wide.
Gateway 2 and Gateway 3 Support
On a higher-risk building the Building Safety Regulator decides when you may start on site and when anyone may move in, which makes a thin application the most expensive delay in the programme. We prepare, submit and defend Gateway 2 and Gateway 3 applications and run the change control between them.
Building Safety Case Reports
A building safety case is the body of evidence that demonstrates a higher-risk building is safe to occupy. The safety case report submitted to the Building Safety Regulator is the summary of that case. We help Accountable Persons build both, with the fire strategy evidence produced in-house.
Regulation 38 Fire Safety Information
Regulation 38 is the point where a building's fire design is handed to the people who have to live with it. It is also the duty most often skipped, which is why so many Responsible Persons manage a building they have never been told how to operate. We compile, review and reconstruct Regulation 38 fire safety information.
Across the lifecycle
Fire strategy input at every RIBA stage.
Fire safety is not a single deliverable. It is a thread running through every stage of a project, from the first site appraisal to the day the building is occupied.
Strategic definition and preparation
Initial fire safety objectives, site constraints and feasibility input to inform the brief. On a higher-risk scheme, the threshold check for Gateway 1.
Concept design
Concept fire strategy, means of escape, compartmentation approach and fire safety design options. The planning fire statement for Gateway 1 and London Plan D12.
Spatial coordination
Developed fire strategy, updated escape analysis, compartmentation coordination and the design parameters for suppression and detection.
Technical design
Technical fire strategy and specifications, fire strategy plans and the Gateway 2 submission to the Building Safety Regulator. Coordination with structural and services engineers.
Manufacturing and construction
Review of contractor submissions, resolution of fire safety queries and change control on higher-risk buildings.
Handover
As-built fire strategy and plans, the Regulation 38 pack, Gateway 3 completion evidence and the golden thread handed to the Accountable Person.
Use
The strategy becomes the baseline for the fire risk assessment, the safety case and every future change to the building.
Not sure where your project sits?
How it worksAccreditations
Professional memberships and third party certification held by the practice.
Start your fire strategy
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK