Weymouth town centre, the Esplanade and the Peninsula
Weymouth's Kings Statue on the Esplanade and the Church of St Mary are listed Grade I while the repair and replacement of the Peninsula seawalls formed part of a Levelling Up bid awarded £19.5 million in 2023. We write fire strategies for Weymouth's listed buildings, harbour properties and new development.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Weymouth buildings
Dorset Council has a duty to repair and replace the two seawalls that support Weymouth Peninsula. Knights Brown started on site in October 2025 and the work was due to finish by late summer 2026. The repair is meant to keep the Peninsula sound for a further 70 years.
The walls were part of the 2022 Levelling Up bid, which was awarded £19.5 million in 2023. The council says plans for developing the Peninsula have not been drawn up at this stage.
The West Dorset, Weymouth and Portland Local Plan was adopted by Weymouth and Portland Borough Council on 15th October 2015 and by West Dorset District Council on 22nd October 2015. Dorset Council is now preparing a Dorset Local Plan under the new planning system.
Who decides
Who approves a fire strategy in Weymouth
- Planning
- Dorset Council (official source, opens in a new tab)
- Uses the 2015 joint plan for West Dorset, Weymouth and Portland.
- Building control
- Dorset Council Building Control (official source, opens in a new tab)
- Site inspections are booked through the council's own service. Approval for a higher-risk building comes from the Building Safety Regulator.
- Fire station
- Weymouth Fire Station (official source, opens in a new tab)
- Dorset and Wiltshire Fire and Rescue. The station page links a project for a new training centre on the site.
- Regeneration
- Peninsula harbour walls (official source, opens in a new tab)
- Dorset Council's page on the seawall repair and replacement scheme.
Local issues
What a Weymouth fire strategy has to deal with.
A Grade II* Guildhall
The Guildhall on St Edmund Street is listed Grade II* with its attached rear boundary wall. A civic building that welcomes the public needs exits and alarms adapted with as little loss of historic fabric as possible.
A Grade I church in wider use
The Church of St Mary on St Mary Street is Grade I. Concerts and community events in a church need occupancy limits and escape planned around a layout that cannot be rearranged.
Future plans for the Peninsula
The council has not yet drawn up development plans for the Peninsula. Any scheme there will stand on land held up by seawalls. Fire engine access and water supply belong in the earliest design work.
Training at a working station
Dorset and Wiltshire Fire and Rescue is looking to provide operational training at Devizes and Weymouth. Building beside a live fire station means turnout routes for appliances must stay clear while contractors work.
Building types
The building types we see in Weymouth
- Fire Strategy for Heritage Buildings and Conversions
The Guildhall on St Edmund Street and the Church of St Mary
- Fire Strategy for Transport and Infrastructure
The Peninsula seawalls and the harbour
- Fire Strategy for Blocks of Flats and Apartments
New homes planned under the 2015 West Dorset, Weymouth and Portland Local Plan
What we deliver
Fire strategy services in Weymouth.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Strategy Plans and Drawings
Annotated plans for every storey, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read moreCommon questions
Fire strategy questions in Weymouth, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsThe West Dorset, Weymouth and Portland Local Plan adopted in October 2015 remains the adopted plan. Dorset Council is preparing a replacement Dorset Local Plan under the new planning system.
Guides
Guides worth reading first.
More in South West England
All locationsFire strategy in Weymouth
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply