Bournemouth town centre, Boscombe and West Howe
BCP Council's offices on Bourne Avenue occupy the former Mont Dore Hotel, converted into the Town Hall in 1921, while an HMO Article 4 Direction has covered the whole Bournemouth area since December 2011. We write fire strategies for Bournemouth's hotels, shared houses, flats and theatres.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Bournemouth buildings
Planning in Bournemouth still rests on the Core Strategy of 2012 and the Bournemouth Town Centre Area Action Plan of 2013. BCP Council withdrew its 2024 draft Local Plan and is now preparing a plan for 2029 to 2044 under the new system.
Bournemouth, Christchurch and Poole together have 48 conservation areas. Bournemouth's include East Cliff from 1987, West Cliff and Poole Hill from 1989, Old Christchurch Road from 1993 and Boscombe Spa from 1994.
Pride in Place sets aside up to £20 million over ten years for each of three neighbourhoods, two of them Boscombe West and West Howe. The Towns Fund Boscombe Masterplan aims to create a new neighbourhood in the heart of Boscombe. In May 2025 University Hospitals Dorset moved the emergency department at Royal Bournemouth Hospital overnight into the new BEACH building.
Who decides
Who approves a fire strategy in Bournemouth
- Planning
- BCP Council (official source, opens in a new tab)
- Judges Bournemouth applications against the 2012 Core Strategy and the 2013 town centre plan.
- Building control
- BCP Council Building Control (official source, opens in a new tab)
- The council's page warns that three registered approvers have ceased trading. Higher-risk buildings fall to the Building Safety Regulator.
- Fire station
- Springbourne Fire Station (official source, opens in a new tab)
- Dorset and Wiltshire Fire and Rescue. A British Red Cross emergency response unit shares the station.
- Regeneration
- Towns Fund, Boscombe (official source, opens in a new tab)
- BCP Council's page on the Boscombe Masterplan and its grants for traders.
Local issues
What a Bournemouth fire strategy has to deal with.
Shared houses across the town
Since December 2011 the Article 4 Direction has required planning permission to change a house anywhere in the Bournemouth area into an HMO. Tenants who live separately need detection, fire doors and a protected way out that do not rely on each other.
Historic hotels
The Royal Bath Hotel on Bath Road is listed Grade II. Guests asleep in unfamiliar rooms are the main risk in any hotel. Corridor separation and early warning carry most of the strategy.
A hotel turned town hall
The former Mont Dore Hotel became the Town Hall in 1921 and is listed Grade II. Council offices in a building planned for hotel guests need escape routes and compartments checked against the way it is used now.
A new Boscombe neighbourhood
The Towns Fund Boscombe Masterplan plans a new neighbourhood in the centre of Boscombe. Regeneration at that scale is built in stages. Fire engine routes and water supplies have to work at each one.
Building types
The building types we see in Bournemouth
- Fire Strategy for Hotels and Hospitality
The Royal Bath Hotel on Bath Road
- Fire Strategy for Houses in Multiple Occupation
Shared houses under the town wide Article 4 Direction
- Fire Strategy for Retail and Leisure Buildings
The Pavilion Theatre on Westover Road and the Russell-Cotes Museum
- Fire Strategy for Hospitals and Healthcare Buildings
The BEACH building at Royal Bournemouth Hospital
What we deliver
Fire strategy services in Bournemouth.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read moreCommon questions
Fire strategy questions in Bournemouth, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsBCP Council's building control page says JHAI Ltd, Assent and Oculus have ceased trading. They can no longer carry out their duties as registered building control approvers.
Guides
Guides worth reading first.
More in South West England
All locationsFire strategy in Bournemouth
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply