Poole Quay, Hamworthy and Talbot Village
Poole's Old Custom House on The Quay is listed Grade II* while the 40 acre Holes Bay site in Hamworthy was left vacant when its power station closed in 1994. We write fire strategies for Poole's harbourside buildings, flats, museums and regeneration sites.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Poole buildings
The Poole Local Plan of 2018 sets out homes, jobs and infrastructure to 2033, backed by the Poole Town Centre SPD of 2015. A transitional period for nitrogen mitigation under the Nitrogen Reduction in Poole Harbour SPD was in place until 31st July 2026.
BCP Council's Holes Bay page describes up to 830 new homes on the Poole Harbour waterfront. At Poole Museum a National Lottery Heritage Fund project aims to conserve and open up the medieval Town Cellars, known as the Wool Hall, with a new maritime gallery.
Talbot Village is the only part of Poole under the HMO Article 4 Direction, which took effect there on 1st May 2013. The Guildhall on Market Street, the Church of St James and the Custom House were all first listed on 14th June 1954.
Who decides
Who approves a fire strategy in Poole
- Planning
- BCP Council (official source, opens in a new tab)
- Applies the Poole Local Plan of 2018 to applications in the Poole area.
- Building control
- BCP Council Building Control (official source, opens in a new tab)
- One service for the whole conurbation. A higher-risk building sits outside its remit and goes to the Building Safety Regulator.
- Fire station
- Poole Fire Station (official source, opens in a new tab)
- Dorset and Wiltshire Fire and Rescue. Thursday night is training night for the on-call watch.
- Regeneration
- Holes Bay (official source, opens in a new tab)
- The council's page on the former power station site in Hamworthy.
Local issues
What a Poole fire strategy has to deal with.
Homes on a former power station site
Holes Bay covers 40 acres on the harbour waterfront in Hamworthy. A site for up to 830 homes needs fire service routes and hydrants laid out before the first blocks are lived in.
Medieval cellars opened to visitors
Poole Museum's project aims to open up the Town Cellars to the public. Bringing more visitors into a medieval building means exits, detection and fire loads need assessing without harming the fabric.
Listed buildings on The Quay
The Old Custom House is Grade II* and the Harbour Office is Grade II, both on The Quay. Small historic buildings often have only one stair. Detection and fire separation then have to do more of the work.
Shared houses in Talbot Village
Talbot Village has been under the HMO Article 4 Direction since 1st May 2013. A shared house there needs planning permission before it opens. Its fire design should give every bedroom a protected route out.
Building types
The building types we see in Poole
- Fire Strategy for Heritage Buildings and Conversions
The Old Custom House, the Harbour Office and the Guildhall on Market Street
- Fire Strategy for Blocks of Flats and Apartments
Up to 830 homes planned at Holes Bay
- Fire Strategy for Retail and Leisure Buildings
Poole Museum and the Town Cellars
- Fire Strategy for Hospitals and Healthcare Buildings
Poole Hospital, the region's designated trauma unit
What we deliver
Fire strategy services in Poole.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Strategy Plans and Drawings
Annotated plans for every storey, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read moreCommon questions
Fire strategy questions in Poole, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsWithin the Poole area only Talbot Village is covered, from 1st May 2013. The rest of Poole is assessed against a criteria based policy in the Poole Local Plan.
Guides
Guides worth reading first.
More in South West England
All locationsFire strategy in Poole
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply