Cheltenham town centre, Pittville and Golden Valley
Cheltenham's Central Conservation Area covers around 599 hectares, Pittville Pump Room and the Montpellier Rotunda are listed Grade I and building work began in 2026 on the £1 billion Golden Valley campus. We write fire strategies for Cheltenham's spa buildings, hotels and theatres and for the new buildings coming forward at Golden Valley.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Cheltenham buildings
Council news in July 2026 reported that construction had started on the first phase of Golden Valley, a £1 billion cyber and technology campus with HBD as development partner and Bowmer + Kirkland as main contractor. The council expects 12,000 jobs and around 1,000 new homes, 32 percent of them affordable. IDEA, the phase one innovation centre, was 68 percent reserved and is scheduled to complete in early 2028.
The borough's development plan draws on the Joint Core Strategy of 2017, the Cheltenham Plan adopted on 20th July 2020 and saved policies of the 2006 Borough Local Plan. A new Local Development Scheme was adopted on 29th October 2026, ahead of the joint Strategic and Local Plan consultation that runs from 16th November to 31st December 2026.
Gloucestershire County Council designated the Central Conservation Area in May 1973 and the borough extended it on 14th August 1987. Cheltenham counts five Grade I buildings and 2,210 at Grade II, among them the Everyman Theatre on Regent Street, listed on 2nd August 1972.
Who decides
Who approves a fire strategy in Cheltenham
- Planning
- Cheltenham Borough Council (official source, opens in a new tab)
- Works from the Cheltenham Plan of 2020 alongside the Joint Core Strategy.
- Building control
- Cheltenham and Tewkesbury Building Control (official source, opens in a new tab)
- A service shared with Tewkesbury Borough Council. The Building Safety Regulator, not CTBC, approves higher-risk buildings.
- Fire service
- Gloucestershire Fire and Rescue Service (official source, opens in a new tab)
- According to its 2020 to 2021 risk profile the service based an aerial ladder platform at Cheltenham East.
- Regeneration
- Golden Valley (official source, opens in a new tab)
- Borough news on the start of phase one in July 2026.
Local issues
What a Cheltenham fire strategy has to deal with.
The first building at Golden Valley
IDEA is the phase one innovation centre on the cyber campus and is scheduled to complete in early 2028. A workplace that later phases will surround needs fire engine routes and water supplies that still work as the site fills in around it.
Spa rooms in public use
Pittville Pump Room and the Montpellier Rotunda are both Grade I. Events in rooms like these need exits and alarm coverage that leave the listed interiors largely untouched.
An auditorium and a large hotel
The Everyman Theatre is Grade II and the Queens Hotel on the Promenade is Grade II*. A theatre has to clear a seated audience in a managed way, while a hotel has guests asleep upstairs who may not know the building.
A conservation area of 599 hectares
Much of central Cheltenham sits in the Central Conservation Area. Where older buildings there are split into flats, new fire separation and alarm upgrades have to respect the character that the designation protects.
Building types
The building types we see in Cheltenham
- Fire Strategy for Offices and Commercial Buildings
The IDEA innovation centre and later phases at Golden Valley
- Fire Strategy for Heritage Buildings and Conversions
Pittville Pump Room, the Montpellier Rotunda and the Town Hall on Imperial Square
- Fire Strategy for Hotels and Hospitality
The Queens Hotel on the Promenade
- Fire Strategy for Retail and Leisure Buildings
The Everyman Theatre on Regent Street
What we deliver
Fire strategy services in Cheltenham.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read moreCommon questions
Fire strategy questions in Cheltenham, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsCheltenham and Tewkesbury Building Control runs the local authority service for both boroughs.
Guides
Guides worth reading first.
More in South West England
All locationsFire strategy in Cheltenham
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply