Reading town centre, Oxford Road and Katesgrove

Reading's former Civic Centre site is becoming the Minster Quarter beside the Hexagon Theatre, while an Article 4 direction controls new small HMOs in parts of Park, Redlands and Katesgrove wards. We write fire strategies for Reading's flats, shared houses, theatres and listed civic buildings.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Reading buildings

On 7th February 2024 Reading Borough Council chose a development partner for the £250 million Minster Quarter Central scheme on 5.2 acres once occupied by the Civic Centre. The council said it could include over 600 homes, 30 percent of them affordable. It also lists 40,000 sq ft of commercial space, a 102-bed hotel and a new Hexagon Square as a gateway to the Hexagon Theatre and a new Studio Theatre.

A council notice dated 26th February 2026 proposed long leases of about 1.5 hectares of open space at Minster Quarter Central for a residential led mixed use development. The wider Minster Quarter Regeneration Area could deliver upwards of 1,200 homes by the council's estimate.

The Reading Borough Local Plan was adopted on 4th November 2019 and runs to 2036. At the Royal Berkshire NHS Foundation Trust on London Road, the trust says its New Hospital Programme was paused and moved into wave 4, with construction anticipated between 2037 and 2039.

Who decides

Who approves a fire strategy in Reading

Planning
Reading Borough Council (official source, opens in a new tab)
Decides applications across the borough under the Local Plan it adopted in 2019.
Building control
Reading Borough Council Building Control (official source, opens in a new tab)
An in-house team that also plan checks projects in other areas through the LABC Partner Authority Scheme. Gateway applications for higher-risk buildings in Reading are handled by the Building Safety Regulator, not this team.
Fire station
Whitley Wood Fire Station (official source, opens in a new tab)
Home to the Royal Berkshire aerial ladder platform and specialist crews for work at height and hazardous materials.
Article 4
Reading Article 4 directions (official source, opens in a new tab)
HMO controls for Park, Redlands, Katesgrove and Jesse Terrace, plus 15 directions on architectural features.

Local issues

What a Reading fire strategy has to deal with.

01

Hotel, homes and theatre on one site

Minster Quarter Central could bring over 600 homes and a 102-bed hotel together with commercial space beside the Hexagon Theatre. Both sleeping uses have to be compartmented from the commercial parts. Escape planning must also allow for theatre audiences crossing the new square.

02

Small HMOs under Article 4

In the parts of Park, Redlands and Katesgrove wards covered by Reading's HMO direction, a house cannot become a small HMO without planning permission. A conversion that is approved still needs fire separation between lettings, linked detection and a protected route to the front door.

03

Flats above Oxford Road shops

The High Streets Heritage Action Zone was a £1.6m programme from 2020 to 2024 across three conservation areas with a focus on Oxford Road. Upper floor flats on a street like this need an escape route that avoids the shop below, fitted without spoiling frontages the council is trying to protect.

04

A listed gaol and station

Reading Gaol, the former HM Prison, carries a Grade II listing. So does the main building of Reading General Station. Any new use has to work detection, compartment walls and escape into cellular or civic fabric that cannot simply be stripped out.

Building types

The building types we see in Reading

Common questions

Fire strategy questions in Reading, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

The council employs its own building inspectors, plan checker and trainee inspectors. It also checks plans for projects outside Reading through the LABC Partner Authority Scheme.

Guides

Guides worth reading first.

More in South East England

All locations

Fire strategy in Reading

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK