Oxford city centre, Oxpens and Headington
Oxford has controlled HMOs through a city wide Article 4 direction since 25th February 2012 and submitted its Local Plan 2045 on 14th July 2026. We write fire strategies for shared houses, listed buildings and riverside regeneration in Oxford.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Oxford buildings
The Oxford Local Plan 2016 to 2036 was adopted on 8th June 2020. Submission of the Local Plan 2045 was delayed by a High Court order not to submit it before a judicial review claim was determined. The plan went to the Secretary of State on 14th July 2026, with examination expected in autumn or winter 2026.
OxWED, the council's joint venture with Nuffield College, won Best Future Development at the OXProp Awards on 10th September 2026 for its plans for Oxpens. The Oxpens River Bridge received planning permission on 8th July 2024 to support regeneration of the West End.
The city has 18 conservation areas and three Article 4 directions, covering HMOs, Jericho and Osney. The John Radcliffe Hospital in Headington is Oxfordshire's main accident and emergency site and stands on around 66 acres.
Who decides
Who approves a fire strategy in Oxford
- Planning
- Oxford City Council (official source, opens in a new tab)
- Decides applications under the 2020 local plan while the Local Plan 2045 awaits examination.
- Building control
- Oxford City Council Building Control (official source, opens in a new tab)
- A local authority building control service run by the city. Higher-risk work goes through the Building Safety Regulator.
- Fire station
- Rewley Road Fire Station (official source, opens in a new tab)
- Holds a hydraulic platform for high reach work alongside its rescue engines.
- Local plan
- Oxford Local Plan 2045 (official source, opens in a new tab)
- The council's page on the submitted plan.
Local issues
What an Oxford fire strategy has to deal with.
A covered market
The Covered Market is listed Grade II. Many small units under a shared roof need smoke control and compartment lines that stop a fire in one unit reaching its neighbours.
A listed hotel
The Randolph Hotel is listed Grade II. Guests sleeping in a historic building need early detection and bedroom corridors that stay clear of smoke.
HMOs across the city
Every HMO conversion in Oxford needs planning permission under the 2012 Article 4 direction. Shared houses need interlinked detection and a protected stair to the front door.
A riverside neighbourhood
Oxpens is planned as a mixed use riverside neighbourhood linked by the Oxpens River Bridge. Fire service access needs to reach every block from the road rather than relying on riverside paths.
Building types
The building types we see in Oxford
- Fire Strategy for Heritage Buildings and Conversions
The Sheldonian Theatre, the Radcliffe Camera and the Town Hall
- Fire Strategy for Houses in Multiple Occupation
Shared houses under the city wide HMO direction
- Fire Strategy for Hotels and Hospitality
The Randolph Hotel
- Fire Strategy for Hospitals and Healthcare Buildings
The John Radcliffe Hospital in Headington
What we deliver
Fire strategy services in Oxford.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read moreCommon questions
Fire strategy questions in Oxford, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsThe Local Plan 2045 was submitted on 14th July 2026. The council expects examination in autumn or winter 2026, depending on the Planning Inspectorate.
Guides
Guides worth reading first.
More in South East England
All locationsFire strategy in Oxford
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply