Newbury town centre, Speen and the Kennet & Avon Canal
Newbury's former Cloth Hall is listed Grade I, while council works to replace deteriorated steel piling along the River Kennet are due to start on 11th January 2027. We write fire strategies for Newbury's town centre, business parks and listed civic buildings.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Newbury buildings
West Berkshire Council renamed its London Road Industrial Estate as Bond Riverside in March 2023. Its Executive had approved a development brief for the estate on 19th November 2020. A place-making strategy by Hemingway Design followed in September 2023.
The council announced on 30th October 2026 that new sheet piling will go in along the north side of the Kennet between Town Bridge and Park Way Bridge from 11th January 2027. It said the existing steel piling has deteriorated and that sections of towpath are sinking.
The West Berkshire Local Plan Review 2023 to 2041 was adopted in June 2025. A new local plan started on 25th June 2026 and its Gateway 1 self-assessment was published on 30th October 2026. At Greenham Business Park a Local Development Order adopted in December 2018 grants permission in advance within set parameters.
Who decides
Who approves a fire strategy in Newbury
- Planning
- West Berkshire Council (official source, opens in a new tab)
- Plans for Newbury and the rest of the district under the Local Plan Review adopted in June 2025.
- Building control
- Building Control Solutions (official source, opens in a new tab)
- A service West Berkshire shares with Wokingham Borough Council. BCS hands any higher-risk building over to the Building Safety Regulator for approval.
- Fire station
- Newbury Fire Station, Hawthorn Road (official source, opens in a new tab)
- A wholetime station with two fire appliances and a specialist training block on site.
- Regeneration
- Bond Riverside (official source, opens in a new tab)
- The council's regeneration programme for the former London Road Industrial Estate.
Local issues
What a Newbury fire strategy has to deal with.
Works along the Kennet
Buildings that back onto the Kennet towpath may need their exits and fire service approach checked while the piling works are under way. Temporary site compounds can block routes that a fire strategy relies on.
An industrial estate in transition
Bond Riverside is a council-owned industrial estate with an approved development brief. Where new uses arrive beside working units, boundary distances and external fire spread between buildings have to be designed in from the start.
A Grade I former Cloth Hall
The museum building, formerly listed as Cloth Hall, is Grade I and its list entry notes that it later became a grain store. A museum in a building of this age needs detection and escape that protect visitors and collections without harming the listed fabric.
A listed Corn Exchange
The Corn Exchange and the Town Hall and Municipal Buildings both carry Grade II listings. Any public event use of a listed hall has to match audience numbers to the exits the building can provide.
Building types
The building types we see in Newbury
- Fire Strategy for Offices and Commercial Buildings
Greenham Business Park under its Local Development Order
- Fire Strategy for Mixed Use Developments
Bond Riverside on the former London Road Industrial Estate
- Fire Strategy for Heritage Buildings and Conversions
St Nicolas Church, the former Cloth Hall and the Town Hall
- Fire Strategy for Retail and Leisure Buildings
The Corn Exchange
What we deliver
Fire strategy services in Newbury.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read moreCommon questions
Fire strategy questions in Newbury, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsWest Berkshire Council reported on 29th October 2026 that the government is "minded to proceed" with a Ridgeway Council covering West Berkshire and most of South Oxfordshire and Vale of White Horse. On 23rd November 2026 the government replaced that with a new provisional decision for Oxfordshire, open for representations until 14th December 2026. Under the proposal elections would follow in May 2028 and the new council would start on 1st April 2029.
Guides
Guides worth reading first.
More in South East England
All locationsFire strategy in Newbury
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply