Skip to content

Slough town centre, the Trading Estate and Langley

Slough Trading Estate has a Simplified Planning Zone that runs until 11th November 2034, while Queensmere Shopping Centre has a 2022 committee resolution for phased redevelopment. We write fire strategies for Slough's datacentres, warehouses, town centre schemes and listed village buildings.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Slough buildings

Slough's Simplified Planning Zone was adopted on 12th November 2024 after Cabinet approval on 21st October 2024. It lets datacentres, warehouses, research buildings and ancillary uses go up on the Slough Trading Estate without individual planning applications. The council says the estate held 350 businesses employing over 15,000 people in 2024.

On 29th September 2022 the Planning Committee delegated approval of outline application P/19689/000 for the demolition and phased redevelopment of Queensmere Shopping Centre, subject to a Section 106 agreement. The outline covers homes, offices, town centre and leisure uses, a new town square and a multi-storey car park.

Slough still plans from a Core Strategy adopted on 16th December 2008 for the years 2006 to 2026. Work on a Local Plan to 2046 began with a notice of intention on 30th June 2026 and Gateway 1 was announced on 30th October 2026.

Who decides

Who approves a fire strategy in Slough

Planning
Slough Borough Council (official source, opens in a new tab)
Runs the trading estate's Simplified Planning Zone and works from its 2008 Core Strategy while a new plan is prepared.
Building control
Slough Building Control (official source, opens in a new tab)
The council's own registered building inspectors, engineers and technical staff. Taller schemes that count as higher-risk are checked by the Building Safety Regulator rather than this team.
Fire station
Slough Fire Station, Tuns Lane (official source, opens in a new tab)
Holds two fire engines and is the base for the Tinkers Lane crew from Windsor.
Simplified Planning Zone
Slough Trading Estate SPZ (official source, opens in a new tab)
Advance permission for datacentres and warehouses until 11th November 2034.

Local issues

What a Slough fire strategy has to deal with.

01

Datacentres built under the SPZ

The Simplified Planning Zone removes the need for an individual planning application on the trading estate. Building regulations still apply to every datacentre and warehouse. Standby generators, fuel stores and large open data halls need fire separation, suppression choices and appliance access agreed early.

02

Phased demolition at Queensmere

The Queensmere outline is for phased redevelopment with homes alongside town centre, leisure and office uses. Each phase must leave the occupied buildings next to it with working escape routes and a clear approach for fire engines.

03

A Grade I house on Stoke Poges Lane

Baylis House is listed Grade I. Any change of use has to add detection, compartment walls and protected routes out without cutting into historic fabric.

04

A listed booking hall

The booking hall, booking office and travel centre at Slough Station on Brunel Way are listed Grade II. Alterations there must keep passenger circulation clear for evacuation while respecting the listed interior.

Building types

The building types we see in Slough

Common questions

Fire strategy questions in Slough, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

The Simplified Planning Zone in force from 12th November 2024 to 11th November 2034 grants permission for datacentres and warehouses without individual applications. Each building still needs building regulations approval.

Guides

Guides worth reading first.

More in South East England

All locations

Fire strategy in Slough

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.