Overview
Fire strategy for Slough buildings
Slough's Simplified Planning Zone was adopted on 12th November 2024 after Cabinet approval on 21st October 2024. It lets datacentres, warehouses, research buildings and ancillary uses go up on the Slough Trading Estate without individual planning applications. The council says the estate held 350 businesses employing over 15,000 people in 2024.
On 29th September 2022 the Planning Committee delegated approval of outline application P/19689/000 for the demolition and phased redevelopment of Queensmere Shopping Centre, subject to a Section 106 agreement. The outline covers homes, offices, town centre and leisure uses, a new town square and a multi-storey car park.
Slough still plans from a Core Strategy adopted on 16th December 2008 for the years 2006 to 2026. Work on a Local Plan to 2046 began with a notice of intention on 30th June 2026 and Gateway 1 was announced on 30th October 2026.
Who decides
Who approves a fire strategy in Slough
- Planning
- Slough Borough Council (official source, opens in a new tab)
- Runs the trading estate's Simplified Planning Zone and works from its 2008 Core Strategy while a new plan is prepared.
- Building control
- Slough Building Control (official source, opens in a new tab)
- The council's own registered building inspectors, engineers and technical staff. Taller schemes that count as higher-risk are checked by the Building Safety Regulator rather than this team.
- Fire station
- Slough Fire Station, Tuns Lane (official source, opens in a new tab)
- Holds two fire engines and is the base for the Tinkers Lane crew from Windsor.
- Simplified Planning Zone
- Slough Trading Estate SPZ (official source, opens in a new tab)
- Advance permission for datacentres and warehouses until 11th November 2034.
Local issues
What a Slough fire strategy has to deal with.
Datacentres built under the SPZ
The Simplified Planning Zone removes the need for an individual planning application on the trading estate. Building regulations still apply to every datacentre and warehouse. Standby generators, fuel stores and large open data halls need fire separation, suppression choices and appliance access agreed early.
Phased demolition at Queensmere
The Queensmere outline is for phased redevelopment with homes alongside town centre, leisure and office uses. Each phase must leave the occupied buildings next to it with working escape routes and a clear approach for fire engines.
A Grade I house on Stoke Poges Lane
Baylis House is listed Grade I. Any change of use has to add detection, compartment walls and protected routes out without cutting into historic fabric.
A listed booking hall
The booking hall, booking office and travel centre at Slough Station on Brunel Way are listed Grade II. Alterations there must keep passenger circulation clear for evacuation while respecting the listed interior.
Building types
The building types we see in Slough
- Fire Strategy for Data Centres and Energy Storage
Datacentres on the Slough Trading Estate
- Fire Strategy for Warehouses and Industrial Units
Warehousing and research buildings under the SPZ
- Fire Strategy for Mixed Use Developments
The Queensmere Shopping Centre redevelopment
- Fire Strategy for Heritage Buildings and Conversions
Baylis House, St Mary's Church in Langley and the station booking hall
What we deliver
Fire strategy services in Slough.

Fire Engineering
Performance based design, in-house, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read moreCommon questions
Fire strategy questions in Slough, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsThe Simplified Planning Zone in force from 12th November 2024 to 11th November 2034 grants permission for datacentres and warehouses without individual applications. Each building still needs building regulations approval.
Guides
Guides worth reading first.
More in South East England
All locationsFire strategy in Slough
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply