Fire strategy for Peterborough buildings

Peterborough City Council is a unitary council with its own building control team. The current Local Plan was adopted in July 2019. Its replacement for 2024 to 2043 was consulted on from 2nd October to 12th November 2026. The council is aiming to submit it for examination in December 2026.

Heads of Terms for £22.9 million of Towns Fund money were signed in January 2021. The projects include the Cygnet Bridge over the River Nene, an activity centre for climbing and the completed Green Technology Centre at Peterborough College. A further £20 million from the Levelling Up Fund in October 2021 went towards a £32 million building called The Living Lab.

Work is underway on the first stage of the Station Quarter, which will create a new station building on the western side of the railway and refurbish the existing one on the east. Peterborough City Hospital at Bretton Gate took its first patients in November 2010 and has over 700 inpatient beds.

Who decides

Who approves a fire strategy in Peterborough

Planning
Peterborough City Council (official source, opens in a new tab)
Its planning and development pages cover the Local Plan review and the regeneration programme.
Building control
Peterborough City Council Building Control (official source, opens in a new tab)
An in-house team. The Building Safety Regulator, not the council, approves higher-risk buildings.
Fire station
Dogsthorpe Fire Station (official source, opens in a new tab)
One of two wholetime stations in the city, with a fire engine, a rescue vehicle and fire protection staff.
Regeneration
Peterborough Station Quarter (official source, opens in a new tab)
The council's page for the new station building and the North Westgate site.

Local issues

What a Peterborough fire strategy has to deal with.

01

Two Grade I churches

The Cathedral Church of St Peter, St Paul and St Andrew and the Parish Church of St John the Baptist are both listed Grade I. Upgrades in churches of that grade are kept light so that alarms and emergency lighting do not mark the fabric.

02

A rebuilt station

The Station Quarter will put a new building on the western side of the railway and refurbish the eastern one. Passengers, staff and contractors all have to be accounted for in the fire strategy as each part changes.

03

Shared houses

A trial HMO Article 4 direction covered Fletton, Woodston, Hampton and Park from 1st January 2024 to 1st January 2026 and has now expired. A house shared by unrelated people relies on fire doors, linked detection and one protected stair.

04

Teaching and laboratory space

ARU Peterborough opened on time in September 2022. Levelling Up money also went into The Living Lab, a £32 million building. Teaching space and laboratories change use over time, which is why the strategy should set limits that later tenants can follow.

Building types

The building types we see in Peterborough

Common questions

Fire strategy questions in Peterborough, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Peterborough Volunteer Fire Brigade on Bourges Boulevard runs as a private brigade under a contract with Cambridgeshire and Peterborough Fire Authority. Local businessmen formed it in 1884 after a serious fire at the Infirmary.

Guides

Guides worth reading first.

More in East of England

All locations

Fire strategy in Peterborough

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK