Ely city centre, the Maltings and North Ely
Ely has a Grade I cathedral and a Grade I Bishop's Palace that is now a school, while to the north a development of 3,000 homes is planned. We write fire strategies for the city's historic buildings, its hotel and the new housing at North Ely.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Ely buildings
The North Ely development of 3,000 homes comes in two parts. The Church Commissioners' site at Highflyer Farm is for up to 800 homes. The Endurance Estates site is for 1,200 homes.
Both permissions were granted in June 2015. Reserved matters for phases of 199, 200 and 258 dwellings have since been approved. A North Ely Country Park is planned alongside the housing.
The Cathedral of the Holy Trinity and the Bishop's Palace, now The Palace School, are both listed Grade I. Oliver Cromwell's House is Grade II* while the Lamb Hotel and Ely Maltings are Grade II. The city's conservation area is covered by the Ely Conservation Area Appraisal SPD of 2010.
Who decides
Who approves a fire strategy in Ely
- Planning
- East Cambridgeshire District Council (official source, opens in a new tab)
- The district council works from The Grange on Nutholt Lane in Ely.
- Building control
- East Cambridgeshire Building Control (official source, opens in a new tab)
- An in-house team of surveyors for commercial and domestic projects. Approval for any higher-risk building rests with the Building Safety Regulator.
- Fire station
- Ely Fire Station (official source, opens in a new tab)
- On Egremont Street, with two fire engines, one crewed by wholetime firefighters on weekday daytimes.
- Development
- North Ely development (official source, opens in a new tab)
- The council's page for the Highflyer Farm and Endurance Estates sites.
Local issues
What an Ely fire strategy has to deal with.
The cathedral
The Cathedral of the Holy Trinity is listed Grade I. Alterations need listed building consent. Detection, emergency lighting and exit improvements are therefore planned to leave the historic fabric alone wherever possible.
A school in a palace
The Bishop's Palace is Grade I and houses The Palace School. Where historic stairs and corridors cannot be altered, the strategy leans on early warning, drills and staff roles as much as on fabric.
Sleeping guests in a listed hotel
The Lamb Hotel is listed Grade II. Guests asleep in a listed building need warning early enough to get out, which shapes the alarm category and the protection of the stairs.
Housing phase by phase
North Ely is coming forward in reserved matters phases of 199, 200 and 258 dwellings. Each phase needs access for fire appliances and hydrants in place before people move in, even while neighbouring land is still being built.
Building types
The building types we see in Ely
- Fire Strategy for Heritage Buildings and Conversions
The cathedral, Oliver Cromwell's House and Ely Maltings
- Fire Strategy for Schools and Education Buildings
The Palace School in the Bishop's Palace
- Fire Strategy for Hotels and Hospitality
The Lamb Hotel
- Fire Strategy for Blocks of Flats and Apartments
North Ely at Highflyer Farm and the Endurance Estates site
What we deliver
Fire strategy services in Ely.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Fire Strategy Plans and Drawings
Annotated plans for every storey, UK wide
Read moreCommon questions
Fire strategy questions in Ely, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsEast Cambridgeshire District Council, based at The Grange on Nutholt Lane, decides applications in the city. Its own building control team or a registered approver can check the building regulations.
Guides
Guides worth reading first.
More in East of England
All locationsFire strategy in Ely
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply