Watford town centre, Riverwell and Nascot
Watford reopened its restored Colosseum in 2025 within a Grade II listed 1930s civic complex while 580 homes have been delivered at Watford Riverwell beside the hospital. We write fire strategies for venues, new neighbourhoods and hospital buildings across the borough.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Watford buildings
The Town Hall and the former Assembly Hall date from 1937. The Assembly Hall became the Colosseum, which reopened in 2025 after a refurbishment by Morgan Sindall Construction backed by £16 million of Government funding. The council says the Town Hall itself will be opened up in 2027 with a museum, café and innovation hub.
Watford Riverwell is a joint venture between Kier Property and the council south of the town centre. Council news of 4th March 2026 said it had delivered 580 homes of a planned 1,000, a £15m link road to the hospital and about £40m of new infrastructure.
The Watford Local Plan 2021 to 2038 was adopted on 17th October 2022. A Notice of Intention to Commence a review was published on 14th October 2026, with scoping consultation from 11th November to 23rd December 2026 and adoption timetabled for 3rd September 2029.
Who decides
Who approves a fire strategy in Watford
- Planning
- Watford Borough Council (official source, opens in a new tab)
- Its Local Plan 2021 to 2038 is now under review.
- Building control
- St Albans and Watford shared service (official source, opens in a new tab)
- A shared service with St Albans. The Building Safety Regulator is the approving body for higher-risk residential buildings.
- Fire station
- Watford Fire Station (official source, opens in a new tab)
- A full-time Hertfordshire station on Lower High Street, staffed day and night.
- Town Hall Quarter
- Town Hall Quarter (official source, opens in a new tab)
- The council's ten-year programme of eight linked projects.
Local issues
What a Watford fire strategy has to deal with.
A working stage in a listed hall
Historic England's entry for Watford Town Hall includes the assembly hall with a full working stage behind a proscenium arch. A stage has to be separated from the audience and able to vent smoke. In a listed hall both measures must work with the 1930s fabric.
Opening up the Town Hall
The council plans a museum, café, incubation hub and customer services inside the Town Hall from 2027. Bringing the public into the Town Hall in these new uses changes who is in the building and how many. Alarm zoning and escape routes need a fresh assessment.
A hotel beside new shops
Council news of 4th March 2026 said Riverwell Square was on site with a 131-bedroom Travelodge, a Tesco and a Greggs. Where guests sleep in a building shared with retail, the bedrooms need robust compartmentation and an escape route kept apart from the shops.
Rebuilding Watford General
The Government said in January 2025 that a new Watford General would be fully funded, with construction due to begin in 2032. Enabling works worth £12m have started. Phased fire strategies keep a hospital safe while parts of it are replaced around patients.
Building types
The building types we see in Watford
- Fire Strategy for Retail and Leisure Buildings
The Colosseum and The Palace Theatre
- Fire Strategy for Heritage Buildings and Conversions
Watford Town Hall, the Church of St Mary and Holy Rood Church
- Fire Strategy for Blocks of Flats and Apartments
Watford Riverwell, including the 47 family homes of Avenues Phase Two
- Fire Strategy for Hospitals and Healthcare Buildings
Watford General Hospital on Vicarage Road
What we deliver
Fire strategy services in Watford.

Fire Engineering
Performance based design, in-house, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read moreCommon questions
Fire strategy questions in Watford, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsWatford's applications go to the shared building control service it runs in partnership with St Albans District Council.
Guides
Guides worth reading first.
More in East of England
All locationsFire strategy in Watford
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply