Canterbury city centre, the Westgate and Dane John
Canterbury holds a World Heritage Site inscribed in 1988, 97 conservation areas across its district and a £22.7m Levelling Up programme spent on its heritage spaces. We write fire strategies for listed civic buildings, conversions and new work inside the city's conservation areas.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Canterbury buildings
Canterbury Cathedral, St Augustine's Abbey and St Martin's Church were inscribed together by UNESCO in 1988. The district has 97 conservation areas. Article 4 Directions apply in some of them.
Connected Canterbury: Unlocking the Tales of England won £19.9m from the Levelling Up Fund in January 2023. With £2,779,353 of council match funding its budget is £22,685,264, of which £9,440,487 goes on connecting the city's heritage. The council expected all of the work apart from the castle to be finished by early spring 2026, with the Castle Row car park the last project.
The adopted Local Plan dates from July 2017 and runs to 2031. Full Council approved the Regulation 19 consultation on its replacement on 18th March 2026 and that consultation closed on 18th May. In November 2026 the council's timeline showed the draft plan at its submission stage, set for September to December 2026.
Who decides
Who approves a fire strategy in Canterbury
- Planning
- Canterbury City Council (official source, opens in a new tab)
- Decides applications in the city and across a district of 97 conservation areas.
- Building control
- STG Building Control Partnership (official source, opens in a new tab)
- The council's building control partner, a partnership formed in 2007 that also serves Gravesham, Medway and Swale. A higher-risk building is a matter for the Building Safety Regulator.
- Fire station
- Canterbury Fire Station (official source, opens in a new tab)
- On Upper Bridge Street, CT1 2NH. Kent Fire and Rescue Service's March 2025 profile shows two shift-crewed engines here.
- Levelling Up works
- Connected Canterbury (official source, opens in a new tab)
- The council's page on the castle, Westgate Square and story garden works and their timing.
Local issues
What a Canterbury fire strategy has to deal with.
Work beside the West Gate
The West Gate is listed Grade I and Westgate Square is one of the Levelling Up projects. Rebuilding a square around a Grade I gatehouse has to keep a route open for fire engines while the paving and planting change.
Walkways inside the castle keep
The Canterbury Castle Keep works add raised walkways inside the keep with free public access. Visitors on an elevated route inside an old structure need short travel distances and a clear plan for bringing everyone down if the alarm sounds.
A library and museum under one roof
The Public Library and Museum at the Beaney Institute is listed Grade II. Two public uses sharing a historic building call for separation between them and a strategy that protects the collections as well as the people.
Patients who cannot leave unaided
Kent and Canterbury Hospital on Ethelbert Road is run by East Kent Hospitals University NHS Foundation Trust. Ward areas rely on progressive horizontal evacuation into a neighbouring compartment rather than a full evacuation.
Building types
The building types we see in Canterbury
- Fire Strategy for Heritage Buildings and Conversions
Christchurch Cathedral, the West Gate, the Guildhall and the Beaney
- Fire Strategy for Transport and Infrastructure
Canterbury West Station, listed Grade II
- Fire Strategy for Hospitals and Healthcare Buildings
Kent and Canterbury Hospital on Ethelbert Road
- Fire Strategy for Car Parks and Basements
The Castle Row car park project
What we deliver
Fire strategy services in Canterbury.

Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read moreCommon questions
Fire strategy questions in Canterbury, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsCanterbury City Council decides planning applications. For building regulations the council usually sends applicants to its partner, the STG Building Control Partnership.
Guides
Guides worth reading first.
More in South East England
All locationsFire strategy in Canterbury
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply