Skip to content

Worthing town centre, the seafront and Broadwater

Worthing has 27 conservation areas, a Grade II* Edwardian cinema on the front and a listed pier and lido. We write fire strategies for seafront buildings, town centre redevelopment and homes across the borough.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Worthing buildings

Worthing Borough Council adopted the Worthing Local Plan 2020 to 2036 at Full Council on 28th March 2023, replacing the 2011 Core Strategy. The Inspector's report had arrived on 14th October 2022. Building control is run by Adur & Worthing Councils from Worthing Town Hall on Chapel Road.

The county council's Worthing Growth Deal lists a £3.1m Montague Place to Montague Gardens scheme that started in 2025 and was due to finish by summer 2026. Other projects include redeveloping the Grafton multi-storey car park for homes, shops and community space, urgent structural repair to the pier and lido and a District Heat Network.

A 2024 review designated a new Marine Gardens conservation area. The councils said a Town Centre and Seafront Masterplan was underway with completion scheduled for autumn 2026.

Who decides

Who approves a fire strategy in Worthing

Planning
Worthing Borough Council (official source, opens in a new tab)
Plans for the borough outside the National Park, working through Adur & Worthing Councils.
Building control
Adur & Worthing Councils Building Control (official source, opens in a new tab)
Shared by the two councils and based at Worthing Town Hall. Approval of a higher-risk building rests with the Building Safety Regulator.
Fire station
Worthing Fire Station (official source, opens in a new tab)
Station 51 of West Sussex Fire & Rescue Service, at 57 Ardsheal Road.
Regeneration
Worthing Growth Deal (official source, opens in a new tab)
West Sussex County Council's page on the town's funded projects.

Local issues

What a Worthing fire strategy has to deal with.

01

Rebuilding a multi-storey car park site

The Grafton redevelopment brings homes, shops and community space onto one site. Separation between those uses and a protected way out for residents will shape the layout.

02

A listed cinema

The Dome Cinema is listed Grade II*. Smoke control and exit routes for a working auditorium have to be fitted around the listed interior.

03

Pavilions at both ends of the pier

The pier is listed Grade II with its Pierfoot and Pierhead Pavilions. The Growth Deal includes urgent structural repair to the pier. A pavilion at the seaward end means long travel distances and limited fire engine access.

04

A district heat network

The Growth Deal includes a District Heat Network for the town. Energy centres and pipe routes passing through buildings need fire stopping and separation from the spaces around them.

Building types

The building types we see in Worthing

Common questions

Fire strategy questions in Worthing, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Adur & Worthing Councils run it in-house from Worthing Town Hall. The councils have warned of a national shortage of the Registered Building Inspectors now required.

Guides

Guides worth reading first.

More in South East England

All locations

Fire strategy in Worthing

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.