Ashford town centre, Newtown and Henwood

Ashford has a £10.7 million fire training facility begun at Henwood in March 2025, Grade II railway works at Newtown and plans for 220 affordable homes in its town centre. We write fire strategies for Ashford's new apartment blocks, office conversions and listed industrial buildings.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Ashford buildings

The Ashford Local Plan 2030 was adopted in February 2019 and sits beside the Chilmington Green Area Action Plan. Its successor, the Ashford Local Plan 2044, has passed Gateway 1. A notice of intention was published in June 2026 and a scoping consultation ran in September 2026, with the timetable revised for the May 2027 elections.

Kent Fire and Rescue Service broke ground on 4th March 2025 on a £10.7 million real fire training facility at the existing fire station in Henwood. The design has eight carbonaceous burn rooms over the ground, first and fourth floors and simulates a high-rise environment.

A single town centre consultation covers 160 affordable homes at the Tanyard on the former Kent Wool Growers site plus 60 affordable apartments in the vacant Civic Centre on Tannery Lane. The borough has 43 conservation areas, with appraisals and revised boundaries adopted on 21st September 2016.

Who decides

Who approves a fire strategy in Ashford

Planning
Ashford Borough Council (official source, opens in a new tab)
Decides applications for the town and for Chilmington Green.
Building control
Ashford Building Control (official source, opens in a new tab)
The borough's own service, whose account managers liaise with the local fire service. Higher-risk buildings sit with the Building Safety Regulator instead.
Fire station
Ashford Fire Station, Henwood (official source, opens in a new tab)
One shift and one on-call engine in March 2025, on the site chosen for the new training facility.
Regeneration
Town centre regeneration consultation (official source, opens in a new tab)
Covers the Tanyard, the Civic Centre and the Stour Centre solar panel project.

Local issues

What an Ashford fire strategy has to deal with.

01

Six storeys at the Tanyard

The Tanyard proposal sets out 160 affordable homes across four buildings of six storeys or fewer. Blocks of that size sit near the seven storey and 18 metre tests for a higher-risk building. Measured heights will decide which approval route applies.

02

A civic building turned into flats

The vacant Civic Centre on Tannery Lane is planned to become 60 affordable apartments. Converting a council building into homes means checking the fire resistance of the existing structure and adding compartment walls around every flat.

03

Listed railway workshops

The Locomotive Workshops at Newtown Railway Works and the Gate House to the works are both listed Grade II. Long open workshops given a new use need detection and escape planned around their travel distances and listed structure.

04

Works in a working hospital

The trust notes works for a Hyper Acute Stroke Unit at William Harvey Hospital in Willesborough. Building inside an occupied hospital means keeping compartment lines and patient evacuation routes intact at every stage.

Building types

The building types we see in Ashford

Common questions

Fire strategy questions in Ashford, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Ashford Building Control is the borough's own service. It also runs a partner authority scheme for projects outside the borough.

Guides

Guides worth reading first.

More in South East England

All locations

Fire strategy in Ashford

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.