Royal Tunbridge Wells town centre, St James and Pembury
Tunbridge Wells adopted its Local Plan 2020 to 2038 on 10th December 2025 and the council is taking forward a redesign of the Royal Victoria Place shopping centre. We write fire strategies for shopping and leisure buildings, listed civic halls and homes across the borough's 25 conservation areas.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Tunbridge Wells buildings
The Local Plan 2020 to 2038 was adopted by Full Council on Wednesday 10th December 2025. It replaced the 2006 Local Plan, the 2010 Core Strategy and the 2016 Site Allocations Local Plan. The council's site also has a Local Plan Review 2029 page with a Gateway 1 self-assessment summary.
In July 2025 Full Council agreed to progress the design of new shopping and leisure facilities and new homes at Royal Victoria Place, centred on Palm Court, Ely Court and Market Square. A multi-screen boutique cinema is planned for Ely Court. In September 2026 the council said the proposals were moving on after confirmation that the former Friendly Societies Hall and the shops at 3-7 Camden Road will not be listed.
Building control stays with the council's in-house team. Tunbridge Wells Hospital on Tonbridge Road, Pembury, is run by the Maidstone and Tunbridge Wells NHS Trust.
Who decides
Who approves a fire strategy in Tunbridge Wells
- Planning
- Tunbridge Wells Borough Council (official source, opens in a new tab)
- Decides applications under the Local Plan adopted on 10th December 2025.
- Building control
- Tunbridge Wells Building Control (official source, opens in a new tab)
- The council's own surveyors give impartial advice on local schemes. Higher-risk buildings fall outside their remit and go to the Building Safety Regulator.
- Fire station
- Tunbridge Wells Fire Station (official source, opens in a new tab)
- The town's station, one of five in the district according to the service's March 2025 profile.
- Royal Victoria Place
- Royal Victoria Place redevelopment (official source, opens in a new tab)
- The council's page on Palm Court, Ely Court and Market Square.
Local issues
What a Tunbridge Wells fire strategy has to deal with.
A cinema inside a shopping centre
Ely Court is planned to take a multi-screen boutique cinema. Audiences sit in the dark late into the evening, when the shops around them may be shut. Escape routes, smoke control and alarm zones have to work whether or not the mall is trading.
Homes added to a mall
New homes form part of the Royal Victoria Place scheme alongside shops and leisure. Residents need a protected route out that never depends on the mall, with fire resisting construction between the flats and the commercial floors.
Fire engine access past parked cars
In a news item the fire service said parked cars had hampered access to a sheltered housing complex at St Stephen Court and the Stanley Road area while fire alarms were sounding. Sheltered housing depends on crews reaching the door quickly. A strategy for such a site should show the route in and where the engine will stand.
Listed halls and a Grade I church
The Church of King Charles the Martyr is listed Grade I, while the Town Hall, the Assembly Hall and the Opera House are Grade II. Venues in listed buildings need audience escape and fire resisting upgrades that respect the historic fabric.
Building types
The building types we see in Tunbridge Wells
- Fire Strategy for Retail and Leisure Buildings
Royal Victoria Place, with Palm Court, Ely Court and Market Square
- Fire Strategy for Heritage Buildings and Conversions
The Opera House, the Assembly Hall and King Charles the Martyr
- Fire Strategy for Care Homes and Retirement Living
Sheltered housing such as St Stephen Court
- Fire Strategy for Hospitals and Healthcare Buildings
Tunbridge Wells Hospital at Pembury
What we deliver
Fire strategy services in Tunbridge Wells.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read moreCommon questions
Fire strategy questions in Tunbridge Wells, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsThe borough council still decides planning. Ministers had placed Tunbridge Wells in a West Kent unitary in July 2026, a decision withdrawn by a GOV.UK letter of 29th October 2026 that kept all options under consideration.
Guides
Guides worth reading first.
More in South East England
All locationsFire strategy in Tunbridge Wells
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply