Radcliffe town centre, Blackburn Street and Milltown Street
Radcliffe has a regeneration framework running for 15 years, a £40m civic and leisure hub and more than 800 new homes under way or planned. We write fire strategies for new buildings and for the mills and older buildings around them.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Radcliffe buildings
Bury Council's cabinet approved the Radcliffe Strategic Regeneration Framework on 10th June 2020. It guides growth over 15 years and names sites including the former Radcliffe High School, the East Lancashire Paper Mill and Pioneer Mills.
The Radcliffe Hub brings a leisure centre, library and community space into one £40m building, with £20m from the Levelling Up Fund. Construction finished in summer 2026 and Radcliffe Library closed on 3rd October 2026 to move in.
Who decides
Who approves a fire strategy in Radcliffe
- Planning
- Bury Council (official source, opens in a new tab)
- The planning authority for Radcliffe and the framework's growth sites.
- Building control
- The council or a registered building control approver (official source, opens in a new tab)
- A higher-risk building is approved by the Building Safety Regulator.
- Fire and rescue
- Greater Manchester Fire and Rescue Service (official source, opens in a new tab)
- Its stations in the borough of Bury are at Bury, Whitefield and Ramsbottom.
- Regeneration
- Radcliffe regeneration (official source, opens in a new tab)
- The council's page for the framework, the hub, the new school and the new homes.
Local issues
What a Radcliffe fire strategy has to deal with.
A pool, library and gym in one building
The hub has a 25 metre six lane pool, a learner pool, a 100 station gym and climbing walls alongside the library. One building with several uses and spectator seating needs an evacuation plan that works for all of them.
Mill fires
On 27th September 2025 nine fire engines attended a fire at Pioneer Mill on Milltown Street. A firefighter was seriously injured when part of the building collapsed. Older mills need strategies that consider how the structure behaves in fire and how firefighters stay safe.
Homes on former industrial land
The East Lancs Paper Mill site has 400 homes by Morris Homes with Homes England. York Street adds 211 homes and Green Street 132.
Grade I heritage
Radcliffe Tower and the Church of St Mary and St Bartholomew are both listed Grade I. None of Bury's 12 conservation areas is in Radcliffe. Listing does most of the heritage work here.
Building types
The building types we see in Radcliffe
- Fire Strategy for Retail and Leisure Buildings
The Radcliffe Hub's pools, gym and library
- Fire Strategy for Blocks of Flats and Apartments
New homes at the paper mill, York Street and Green Street
- Fire Strategy for Schools and Education Buildings
Star Radcliffe Academy, the town's new secondary school
- Fire Strategy for Heritage Buildings and Conversions
Mills and listed buildings in the town
What we deliver
Fire strategy services in Radcliffe.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Regulation 38 Fire Safety Information
Building Regulations 2010 regulation 38, England and Wales
Read moreCommon questions
Fire strategy questions in Radcliffe, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsIt is a £40m building that brings a leisure centre, library and community space together, part funded by £20m from the Levelling Up Fund. Bury Council describes it as its first carbon zero building.
Guides
Guides worth reading first.
More in Bury
All locationsFire strategy in Radcliffe
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply