Skip to content

Prestwich Village, Church Lane and St Mary's Park

Prestwich is replacing the Longfield Centre with new homes, a library, a market hall and a travel hub. We write fire strategies for schemes like this and for the listed buildings nearby.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Prestwich buildings

Bury Council and Muse formed Prestwich Regeneration LLP in November 2022 to redevelop the former Longfield Centre. Full planning permission for phase 1 was approved in July 2024.

In March 2026 the council described over £100m of investment, including £35m of Good Growth funding. The scheme brings 248 homes built to the Future Homes Standard, a larger library, community rooms, a market hall and a bigger village square.

Who decides

Who approves a fire strategy in Prestwich

Planning
Bury Council (official source, opens in a new tab)
Decides planning applications in Prestwich and the other five Bury towns.
Building control
The council or a registered building control approver (official source, opens in a new tab)
The Building Safety Regulator approves higher-risk buildings.
Fire station
Whitefield Community Fire Station (official source, opens in a new tab)
The borough's station on Bury New Road. Its new building was officially opened on 6th October 2026.
Regeneration
Your Prestwich (official source, opens in a new tab)
The site of the Prestwich Village regeneration run by Bury Council and Muse.

Local issues

What a Prestwich fire strategy has to deal with.

01

Several uses on one site

Homes, a library, a market hall and shops on one site need clear separation between the uses. Their escape routes should not depend on each other.

02

A travel hub with charging

The travel hub off Fairfax Road has 301 spaces with electric vehicle charging. Charging points change the fire load a car park strategy has to plan for.

03

Demolition beside a working village

Demolition of the Longfield Centre was due to run from August 2026 into early 2027, with the library working from the Phoenix Centre in St Mary's Park. Phased works need interim fire arrangements for the parts still in use.

04

Listed buildings

The Church of St Mary on Church Lane is listed Grade I and the Church Inn nearby Grade II. St Mary's and Poppythorn are Prestwich's two conservation areas.

Building types

The building types we see in Prestwich

Common questions

Fire strategy questions in Prestwich, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Prestwich is one of the six towns of the borough of Bury. Planning applications there go to Bury Council, not to Manchester City Council.

Guides

Guides worth reading first.

More in Bury

All locations

Fire strategy in Prestwich

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.