Prestwich Village, Church Lane and St Mary's Park
Prestwich is replacing the Longfield Centre with new homes, a library, a market hall and a travel hub. We write fire strategies for schemes like this and for the listed buildings nearby.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Prestwich buildings
Bury Council and Muse formed Prestwich Regeneration LLP in November 2022 to redevelop the former Longfield Centre. Full planning permission for phase 1 was approved in July 2024.
In March 2026 the council described over £100m of investment, including £35m of Good Growth funding. The scheme brings 248 homes built to the Future Homes Standard, a larger library, community rooms, a market hall and a bigger village square.
Who decides
Who approves a fire strategy in Prestwich
- Planning
- Bury Council (official source, opens in a new tab)
- Decides planning applications in Prestwich and the other five Bury towns.
- Building control
- The council or a registered building control approver (official source, opens in a new tab)
- The Building Safety Regulator approves higher-risk buildings.
- Fire station
- Whitefield Community Fire Station (official source, opens in a new tab)
- The borough's station on Bury New Road. Its new building was officially opened on 6th October 2026.
- Regeneration
- Your Prestwich (official source, opens in a new tab)
- The site of the Prestwich Village regeneration run by Bury Council and Muse.
Local issues
What a Prestwich fire strategy has to deal with.
Several uses on one site
Homes, a library, a market hall and shops on one site need clear separation between the uses. Their escape routes should not depend on each other.
A travel hub with charging
The travel hub off Fairfax Road has 301 spaces with electric vehicle charging. Charging points change the fire load a car park strategy has to plan for.
Demolition beside a working village
Demolition of the Longfield Centre was due to run from August 2026 into early 2027, with the library working from the Phoenix Centre in St Mary's Park. Phased works need interim fire arrangements for the parts still in use.
Listed buildings
The Church of St Mary on Church Lane is listed Grade I and the Church Inn nearby Grade II. St Mary's and Poppythorn are Prestwich's two conservation areas.
Building types
The building types we see in Prestwich
- Fire Strategy for Mixed Use Developments
The Prestwich Village scheme of homes, shops and community space
- Fire Strategy for Car Parks and Basements
The travel hub and its electric vehicle charging
- Fire Strategy for Hospitals and Healthcare Buildings
Greater Manchester Mental Health NHS Foundation Trust on Bury New Road
- Fire Strategy for Heritage Buildings and Conversions
Listed buildings around Church Lane
What we deliver
Fire strategy services in Prestwich.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Fire Strategy Plans and Drawings
Annotated plans for every storey, UK wide
Read moreCommon questions
Fire strategy questions in Prestwich, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsPrestwich is one of the six towns of the borough of Bury. Planning applications there go to Bury Council, not to Manchester City Council.
Guides
Guides worth reading first.
More in Bury
All locationsFire strategy in Prestwich
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply