Luton town centre, the Hat District and Power Court
Luton's town centre is planned for £1.7 billion of investment, including a 25,000 capacity stadium at Power Court approved in 2024, while its airport expands under a 2025 Development Consent Order. We write fire strategies for car parks, stadium and venue schemes, old hat factories and new homes in the town.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Luton buildings
The Luton Town Centre Delivery Plan 2025 to 2030 speaks of £1.7 billion of planned investment across four quarters, from Station and Hat District to St George's Square. It records that Power Court received planning approval in 2024 for a 25,000 capacity football stadium alongside homes, a hotel and restaurants.
The London Luton Airport Expansion Development Consent Order 2025 was made on 3rd April 2025 and came into force on 24th April. On 10th October 2023 a diesel car fire on level three of Terminal Car Park 2 spread to many vehicles and led to a partial structural collapse.
Luton Town Hall is listed Grade II. Its design was chosen by competition from 86 entries in 1930 after the town hall of 1847 burnt down during the Peace Riots of 19th July 1919. Work on a new Local Plan began with a notice of intention published on 28th May 2026.
Who decides
Who approves a fire strategy in Luton
- Planning
- Luton Borough Council (official source, opens in a new tab)
- A unitary council preparing a new Local Plan since May 2026.
- Building control
- Luton Borough Council building control (official source, opens in a new tab)
- The council's own team, which also covers safety at sports grounds. Higher-risk buildings need the Building Safety Regulator's approval.
- Fire station
- Luton Community Fire Station (official source, opens in a new tab)
- Bedfordshire's busiest station, with two rescue pumps and the Luton Aerial Platform.
- Incident review
- London Luton Airport car park fire review (official source, opens in a new tab)
- Bedfordshire Fire and Rescue's report on the Terminal Car Park 2 fire.
Local issues
What a Luton fire strategy has to deal with.
Multi-storey car parks
Bedfordshire Fire and Rescue's review, published on 9th October 2024, found the most probable cause of the Car Park 2 fire was an electrical fault in an engine bay. It says a suitable sprinkler system might have changed and delayed the spread. Car park strategies now have to deal with fire moving from vehicle to vehicle and with how the structure holds up.
A town centre stadium
The Power Court stadium was approved in 2024 for 25,000 spectators. Crowds of that size need evacuation modelling and routes out onto town centre streets planned together with the homes and hotel beside the ground.
Former hat factories
Plaiters' Lea is the Hat District conservation area. Number 50 Guildford Street is a Grade II listed hat factory of about 1900. Reusing a building like this usually means adding protected stairs and fire stopping between floors that were built as open workrooms.
Commercial space turned into flats
An Article 4 Direction removed the commercial to residential right across Luton Town Centre and its surrounds from 6th October 2023. Conversions there now pass through planning, where separation and escape for the new flats can be settled early.
Building types
The building types we see in Luton
- Fire Strategy for Car Parks and Basements
Multi-storey parking at London Luton Airport
- Fire Strategy for Retail and Leisure Buildings
The Power Court stadium scheme
- Fire Strategy for Heritage Buildings and Conversions
Luton Town Hall, the Red Lion Hotel and 50 Guildford Street
- Fire Strategy for Hospitals and Healthcare Buildings
Luton and Dunstable University Hospital and the diagnostic centre at the University of Bedfordshire's Luton Campus
What we deliver
Fire strategy services in Luton.

Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read moreCommon questions
Fire strategy questions in Luton, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsLuton Borough Council runs its own service. Its page reminds applicants that they must ask the council to inspect works at the relevant stages.
Guides
Guides worth reading first.
More in East of England
All locationsFire strategy in Luton
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply