Kettering town centre, the Station Quarter and Hanwood Park
Kettering has reopened its Alfred East Gallery and Library, plans up to 5,500 homes at Hanwood Park and has listed boot and shoe factories. We write fire strategies for civic buildings, new homes and factory conversions.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Kettering buildings
The Grade II Alfred East Gallery and Library reopened on 10th November 2026 after both roofs were replaced and an extension added. Hanwood Park has outline permission for up to 5,500 homes, granted on 1st April 2010.
A local development order for Kettering General Hospital was approved on 22nd August 2022. The Station Quarter masterplan includes a possible second station entrance.
Who decides
Who approves a fire strategy in Kettering
- Planning
- North Northamptonshire Council (official source, opens in a new tab)
- The planning authority for Kettering, Corby and Wellingborough.
- Building control
- The council or a registered building control approver (official source, opens in a new tab)
- A higher-risk building is approved by the Building Safety Regulator instead.
- Fire station
- Kettering Fire Station (official source, opens in a new tab)
- On Headlands, with a new station proposed on Cherry Hall Road.
- Hospital
- Kettering General Hospital local development order (official source, opens in a new tab)
- Approved on 22nd August 2022.
Local issues
What a Kettering fire strategy has to deal with.
A gallery and library
The Alfred East Gallery and Library combine collections and public space. Galleries need strategies that protect collections as well as visitors.
Hospital growth
The local development order lets Kettering General Hospital grow without separate planning permission for each building. Each new building still needs a fire strategy for building control.
Shoe factories
Dalkeith Works of 1873 and Globe Works of 1891 are listed Grade II. Dalkeith's list entry describes it as one of the earliest large boot and shoe factories in Kettering.
A Grade I church
The Church of St Peter and St Paul is listed Grade I. The town centre has had High Street Heritage Action Zone grants.
Building types
The building types we see in Kettering
- Fire Strategy for Heritage Buildings and Conversions
Dalkeith Works, Globe Works and the gallery
- Fire Strategy for Blocks of Flats and Apartments
Homes at Hanwood Park
- Fire Strategy for Hospitals and Healthcare Buildings
Kettering General Hospital
- Fire Strategy for Transport and Infrastructure
The Station Quarter
What we deliver
Fire strategy services in Kettering.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read moreCommon questions
Fire strategy questions in Kettering, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsNorth Northamptonshire Council has been the planning authority since 1st April 2021. It also covers Corby and Wellingborough.
Guides
Guides worth reading first.
More in East Midlands
All locationsFire strategy in Kettering
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply