Skip to content

Chesterfield town centre, Waterside and Staveley

Chesterfield has a church with a twisted spire, a £19m remodel of its Stephenson Memorial Hall and about 1,500 homes planned at Chesterfield Waterside. We write fire strategies for venues, new homes and historic buildings.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Chesterfield buildings

Chesterfield secured nearly £20m from the Levelling Up Fund in November 2021, including £11m towards a £19m remodel of the Grade II Stephenson Memorial Hall. Chesterfield Waterside has outline permission for about 1,500 homes and 30,000 square metres on the former Trebor and Bassett site.

The station masterplan, adopted on 20th July 2021, plans about 850 jobs and a multi-storey car park of about 550 spaces. Staveley received a £25.2m Town Deal in March 2021.

Hartington Staveley, part of the East Midlands Investment Zone, takes in 170 acres of the former Staveley Chemical works. Chesterfield has almost £20m of Pride in Place money for 2026 to 2036. The borough has 12 conservation areas, including Church Close in the town centre.

Who decides

Who approves a fire strategy in Chesterfield

Planning
Chesterfield Borough Council (official source, opens in a new tab)
The planning authority for the town and Staveley.
Building control
Derbyshire Building Control Partnership (official source, opens in a new tab)
Shared by eight councils. A registered building control approver can act instead.
Fire station
Chesterfield Fire Station (official source, opens in a new tab)
On Braidwood Way at Spire Walk, wholetime with an aerial ladder platform.
Regeneration
Revitalising the Heart of Chesterfield (official source, opens in a new tab)
The council's page for the Levelling Up programme.

Local issues

What a Chesterfield fire strategy has to deal with.

01

A theatre remodelled

The Stephenson Memorial Hall is listed Grade II and is being remodelled. Theatres need exit capacity, stage separation and smoke control within their fabric.

02

Homes on a former factory site

Chesterfield Waterside's 1,500 homes are on the former Trebor and Bassett site. Phased waterside housing needs appliance access planned from the start.

03

A station car park

The station masterplan includes a multi-storey car park of about 550 spaces. Car parks need ventilation and separation planned for modern vehicles.

04

A twisted spire

The Church of St Mary and All Saints, whose spire twists and leans, is listed Grade I. The Town Pump is Grade II*.

Building types

The building types we see in Chesterfield

Common questions

Fire strategy questions in Chesterfield, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Chesterfield Borough Council is the planning authority. Building control is the Derbyshire Building Control Partnership or a registered building control approver.

Guides

Guides worth reading first.

More in East Midlands

All locations

Fire strategy in Chesterfield

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.