Hereford city centre, Blackfriars and Castle Green
Hereford has a Grade I timber framed house of about 1621, a Grade I cathedral and a new engineering university that builds in timber. We write fire strategies for historic buildings and for modern timber construction.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Hereford buildings
NMITE's Skylon campus is built in timber to demonstrate the material and houses its Centre for Advanced Timber Technology. Its Blackfriars campus is a retrofitted school of 1912.
The Stronger Hereford Towns Fund has £22.4m for 15 projects. The Castle Green Pavilion opened on 19th September 2025. Herefordshire Council is preparing a new Local Plan for 2025 to 2045.
Who decides
Who approves a fire strategy in Hereford
- Planning
- Herefordshire Council (official source, opens in a new tab)
- The planning authority for the city and the county.
- Building control
- The council or a registered building control approver (official source, opens in a new tab)
- The council's building control team works closely with the fire service.
- Fire station
- Hereford Fire Station (official source, opens in a new tab)
- Being rebuilt on St Owen Street as a £13.5m, four storey station.
- Towns Fund
- Stronger Hereford (official source, opens in a new tab)
- The Towns Fund board's site for the city's projects.
Local issues
What a Hereford fire strategy has to deal with.
Timber construction
NMITE's Skylon campus is built in timber. Mass timber needs a strategy that shows how the structure keeps its fire resistance and how exposed timber affects fire growth.
Sprinklers and batteries
In May 2026 a sprinkler system controlled a lithium ion battery fire at a Hereford food factory. Battery storage in industrial buildings needs suppression and separation designed for it.
A Grade I timber house
The cathedral and the Old House, a timber framed building of about 1621, are listed Grade I. Shire Hall by Sir Robert Smirke is Grade II*.
Conservation
The county has 64 conservation areas, including the Central Area of Hereford. Fire safety changes to shopfronts and upper floors there are judged against its character.
Building types
The building types we see in Hereford
- Fire Strategy for Schools and Education Buildings
NMITE's timber and Blackfriars campuses
- Fire Strategy for Heritage Buildings and Conversions
The Old House, the cathedral and Shire Hall
- Fire Strategy for Warehouses and Industrial Units
Food factories and industrial units
- Fire Strategy for Hospitals and Healthcare Buildings
Hereford County Hospital
What we deliver
Fire strategy services in Hereford.

Fire Engineering
Performance based design, in-house, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read moreCommon questions
Fire strategy questions in Hereford, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsHerefordshire Council is the planning authority and runs its own building control service.
Guides
Guides worth reading first.
More in West Midlands
All locationsFire strategy in Hereford
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply