Stafford town centre, the Station Gateway and Forebridge
Stafford has nearly £20m for its Station Gateway and a framework for up to 200 town centre homes and a new market hall. We write fire strategies for new homes, college buildings and the town's listed centre.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Stafford buildings
Stafford secured just under £20m from the Levelling Up Fund on 20th November 2023 for the 28 hectare Station Gateway, where a £13m Institute of Technology is being built. Its regeneration framework was adopted on 24th January 2023.
A town centre development framework agreed on 9th April 2026 plans up to 200 homes, a new market hall and 6,000 square metres of college space. The frontages of the Guildhall and Co-op buildings are to be kept.
Who decides
Who approves a fire strategy in Stafford
- Planning
- Stafford Borough Council (official source, opens in a new tab)
- The planning authority for the town and the borough.
- Building control
- The council or a registered building control approver (official source, opens in a new tab)
- The council's building control team is shared with Cannock Chase.
- Fire station
- Stafford Fire Station (official source, opens in a new tab)
- On Hydrant Way, with a rope rescue unit.
- Regeneration
- Stafford Station Gateway (official source, opens in a new tab)
- The council's page for the station area scheme.
Local issues
What a Stafford fire strategy has to deal with.
Frontages kept, buildings rebuilt
The Guildhall and Co-op buildings are to be demolished behind retained frontages. New buildings behind old façades need fire separation and escape designed around the retained walls.
College space
The Institute of Technology and 6,000 square metres of college space bring students into the town centre. Education buildings need escape and alarm strategies for large, changing populations.
A listed town centre
The Stafford Town Centre conservation area was designated on 27th November 1971. St Mary's Church is listed Grade I and Shire Hall and High House Grade II*.
Factory fires
Staffordshire Fire and Rescue attended a factory fire on Ranshaw Drive on 6th October 2026. Industrial units need compartmentation and access that limit losses.
Building types
The building types we see in Stafford
- Fire Strategy for Blocks of Flats and Apartments
Up to 200 town centre homes
- Fire Strategy for Schools and Education Buildings
The Institute of Technology and college space
- Fire Strategy for Heritage Buildings and Conversions
Shire Hall, High House and St Mary's
- Fire Strategy for Hospitals and Healthcare Buildings
County Hospital on Weston Road
What we deliver
Fire strategy services in Stafford.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read moreCommon questions
Fire strategy questions in Stafford, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsStafford Borough Council is the planning authority. Its building control service is shared with Cannock Chase District Council.
Guides
Guides worth reading first.
More in West Midlands
All locationsFire strategy in Stafford
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply