Stratford town centre, the Canal Quarter and the Gateway
Stratford-upon-Avon has Grade I timber framed houses, a Grade II* theatre and a Canal Quarter planned for up to 650 homes. We write fire strategies for historic buildings and for new development around them.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Stratford buildings
The Canal Quarter masterplan, adopted on 16th July 2018, plans up to 650 homes and 9,000 square metres of employment space, including Masons Road where the fire station stands. The Gateway masterplan, adopted on 22nd April 2024, is anchored by a proposed World Shakespeare Centre.
Shakespeare's Birthplace and Harvard House are timber framed and listed Grade I, as are Hall's Croft, Holy Trinity and the Guildhall. The Royal Shakespeare Theatre is Grade II*.
Who decides
Who approves a fire strategy in Stratford-upon-Avon
- Planning
- Stratford-on-Avon District Council (official source, opens in a new tab)
- The planning authority for the town and the district.
- Building control
- Stratford District Building Control (official source, opens in a new tab)
- The council's own team, with surveyors registered with the Building Safety Regulator.
- Fire station
- Stratford-upon-Avon Fire Station (official source, opens in a new tab)
- On Masons Road, opened on 26th September 1953.
- Masterplan
- Canal Quarter (official source, opens in a new tab)
- The council's regeneration zone guidance for the Canal Quarter.
Local issues
What a Stratford fire strategy has to deal with.
Timber framed Grade I houses
Timber framed buildings behave in fire differently from modern construction. Fire safety works to Grade I timber houses need consent and careful detailing.
A theatre
The Royal Shakespeare Theatre is listed Grade II*. Large audiences in a historic theatre need exit capacity and smoke control within the fabric.
A canalside quarter around the fire station
Up to 650 homes in the Canal Quarter include the fire station's own site on Masons Road. Phased redevelopment around a working fire station needs fire service access kept throughout.
District heritage
Stratford-on-Avon district has 75 conservation areas and more than 3,000 listed buildings.
Building types
The building types we see in Stratford
- Fire Strategy for Heritage Buildings and Conversions
Timber framed Grade I houses
- Fire Strategy for Retail and Leisure Buildings
The Royal Shakespeare Theatre
- Fire Strategy for Blocks of Flats and Apartments
Homes in the Canal Quarter
- Fire Strategy for Hospitals and Healthcare Buildings
Stratford Hospital
What we deliver
Fire strategy services in Stratford-upon-Avon.

Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read moreCommon questions
Fire strategy questions in Stratford-upon-Avon, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsStratford-on-Avon District Council is the planning authority and runs its own building control.
Guides
Guides worth reading first.
More in West Midlands
All locationsFire strategy in Stratford-upon-Avon
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply