Solihull town centre, Arden Cross and the NEC
Solihull hosts the planned HS2 Interchange station and the NEC. It also has Grade I halls from Grimshaw Hall to Castle Bromwich Hall. We write fire strategies for venues, offices, new homes and historic buildings.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Solihull buildings
The council leader wrote on 5th June 2026 that the first plots around the HS2 Interchange station at Arden Cross should be available for development from 2030. The council published its draft new Local Plan on 27th October 2026, with responses due by 11th December 2026.
Solihull charges the Building Safety Levy on applications from 1st October 2026, at £17.56 per square metre on previously developed land and £35.12 on other land. The borough has 20 conservation areas.
Who decides
Who approves a fire strategy in Solihull
- Planning
- Solihull Metropolitan Borough Council (official source, opens in a new tab)
- The planning authority for the borough.
- Building control
- The council or a registered building control approver (official source, opens in a new tab)
- A higher-risk building is approved by the Building Safety Regulator.
- Fire station
- Solihull Fire Station (official source, opens in a new tab)
- On Streetsbrook Road. A second station at Bickenhill serves the NEC and is a technical rescue base.
- Local plan
- Solihull draft Local Plan (official source, opens in a new tab)
- The council's page for the emerging plan.
Local issues
What a Solihull fire strategy has to deal with.
An exhibition centre
Bickenhill fire station sits at the NEC. Exhibition halls hold very large crowds and need exit capacity and smoke control designed for them.
A new station quarter
Arden Cross around the HS2 Interchange will bring offices, homes and transport buildings together. Mixed developments at that scale need fire strategy from the masterplan stage.
Grade I halls
Grimshaw Hall, Castle Bromwich Hall and St Alphege Church are listed Grade I. Upgrades in historic houses need consent and minimal intervention.
The Building Safety Levy
The levy adds a charge per square metre to qualifying new residential schemes. Viability now has to account for it alongside fire safety design.
Building types
The building types we see in Solihull
- Fire Strategy for Retail and Leisure Buildings
The NEC and its exhibition halls
- Fire Strategy for Offices and Commercial Buildings
Arden Cross and town centre offices
- Fire Strategy for Blocks of Flats and Apartments
Homes in the draft Local Plan
- Fire Strategy for Heritage Buildings and Conversions
Grimshaw Hall and Castle Bromwich Hall
What we deliver
Fire strategy services in Solihull.

Fire Engineering
Performance based design, in-house, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read moreCommon questions
Fire strategy questions in Solihull, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsSolihull Metropolitan Borough Council is the planning authority. Its draft new Local Plan is out for comment until 11th December 2026.
Guides
Guides worth reading first.
More in West Midlands
All locationsFire strategy in Solihull
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply