Hyde town centre, Godley Green and Hattersley
Hyde had 40 cotton mills at its peak and now has a town centre masterplan and a garden village of up to 2,150 homes on its edge. We write fire strategies for the new homes and for the older town.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Hyde buildings
Tameside's Executive Cabinet adopted the Let's Talk About Hyde masterplan on 14th February 2024 as a material consideration in planning decisions. More than 1,600 people responded to its consultation.
The same decision describes Hyde Town Centre, Hattersley and Godley Green as the Hyde Triangle growth location. Godley Green Garden Village received outline planning permission for up to 2,150 homes on 31st March 2026.
Who decides
Who approves a fire strategy in Hyde
- Planning
- Tameside Metropolitan Borough Council (official source, opens in a new tab)
- The planning authority for Hyde and Godley Green.
- Building control
- The council or a registered building control approver (official source, opens in a new tab)
- For a higher-risk building the Building Safety Regulator takes that role.
- Fire station
- Hyde Community Fire Station (official source, opens in a new tab)
- Greater Manchester Fire and Rescue Service's station on Railway Street.
- Masterplan
- Hyde town centre (official source, opens in a new tab)
- The council's page for the masterplan and the town centre projects.
Local issues
What a Hyde fire strategy has to deal with.
A garden village
Godley Green is being delivered by Tameside Council with MADE Partnership. A development of up to 2,150 homes built in phases needs consistent fire service access and water supplies across all of them.
A 1960s shopping centre
Clarendon Shopping Centre opened in the 1960s and the masterplan records 70 stalls in its indoor market. Covered markets and malls need smoke control and exit capacity for a busy and changing occupancy.
Cotton mill heritage
The masterplan records that Hyde had 40 cotton mills at its nineteenth century peak, with the Peak Forest Canal carrying their goods. A surviving mill given a new use needs a strategy fitted to its structure.
A listed town hall
Hyde Town Hall, built between 1883 and 1885, is listed Grade II. Hyde has no conservation area on the council's list. Listing is therefore the main heritage control in the centre.
Building types
The building types we see in Hyde
- Fire Strategy for Blocks of Flats and Apartments
New homes at Godley Green Garden Village
- Fire Strategy for Retail and Leisure Buildings
Clarendon Shopping Centre, the indoor market and Active Hyde
- Fire Strategy for Heritage Buildings and Conversions
The town hall and surviving mill buildings
What we deliver
Fire strategy services in Hyde.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Strategy Plans and Drawings
Annotated plans for every storey, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read moreCommon questions
Fire strategy questions in Hyde, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsHyde is one of the nine Tameside towns. Planning applications there go to Tameside Council. Its postcodes begin SK14, which is why it is sometimes linked with Stockport.
Guides
Guides worth reading first.
More in Tameside
All locationsFire strategy in Hyde
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply