Skip to content

Cheadle village, Cheadle Royal and Bird Hall Lane

Cheadle has a Towns Fund programme bringing a new station and a timber framed business park. We write fire strategies for new buildings like these and for the listed buildings of the old village.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Cheadle buildings

Cheadle was offered up to £13.9m from the Towns Fund on 3rd March 2021 for three projects. They are a new railway station, a north to south cycleway and an eco business park on Bird Hall Lane.

Stockport Council's character and urban design study finds most buildings in the district centre rise to about two and a half storeys. It sees room for four storeys on small sites and five at gateways and around the new station.

Who decides

Who approves a fire strategy in Cheadle

Planning
Stockport Metropolitan Borough Council (official source, opens in a new tab)
Cheadle is one of Stockport's eight district centres.
Building control
The council or a registered building control approver (official source, opens in a new tab)
The Building Safety Regulator approves higher-risk buildings.
Fire station
Cheadle Community Fire Station (official source, opens in a new tab)
Greater Manchester Fire and Rescue Service's station on Turves Road in Cheadle Hulme.
Towns Fund
Cheadle Towns Fund (official source, opens in a new tab)
The council's page for the station, the cycleway and the eco business park.

Local issues

What a Cheadle fire strategy has to deal with.

01

A timber framed business park

Work on Cheadle Eco Park began in March 2026. It has six units on seven acres with a timber structure instead of steel and is due to finish in March 2027. A timber frame changes how structural fire resistance and fire spread are assessed.

02

Taller homes around the station

The council's study suggests up to five storeys around the new station at densities of up to 200 homes per hectare. Flats at that scale need protected stairs, compartmentation between homes and access for fire appliances.

03

A Grade I church and three conservation areas

The Church of St Mary was built between 1520 and 1558 and is listed Grade I. Cheadle Village has been a conservation area since 1974, with Brooklyn Crescent following in 1979 and Cheadle Royal in 1995.

04

A listed hospital wing

The main wing of Cheadle Royal Hospital on Wilmslow Road, built in 1848 and 1849, is listed Grade II. Works there have to respect the historic fabric as well as the guidance.

Building types

The building types we see in Cheadle

Common questions

Fire strategy questions in Cheadle, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

They are separate district centres in the borough of Stockport. Both go to Stockport Council for planning. The fire station that carries Cheadle's name is on Turves Road in Cheadle Hulme.

Guides

Guides worth reading first.

Fire strategy in Cheadle

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.