Cheadle village, Cheadle Royal and Bird Hall Lane
Cheadle has a Towns Fund programme bringing a new station and a timber framed business park. We write fire strategies for new buildings like these and for the listed buildings of the old village.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Cheadle buildings
Cheadle was offered up to £13.9m from the Towns Fund on 3rd March 2021 for three projects. They are a new railway station, a north to south cycleway and an eco business park on Bird Hall Lane.
Stockport Council's character and urban design study finds most buildings in the district centre rise to about two and a half storeys. It sees room for four storeys on small sites and five at gateways and around the new station.
Who decides
Who approves a fire strategy in Cheadle
- Planning
- Stockport Metropolitan Borough Council (official source, opens in a new tab)
- Cheadle is one of Stockport's eight district centres.
- Building control
- The council or a registered building control approver (official source, opens in a new tab)
- The Building Safety Regulator approves higher-risk buildings.
- Fire station
- Cheadle Community Fire Station (official source, opens in a new tab)
- Greater Manchester Fire and Rescue Service's station on Turves Road in Cheadle Hulme.
- Towns Fund
- Cheadle Towns Fund (official source, opens in a new tab)
- The council's page for the station, the cycleway and the eco business park.
Local issues
What a Cheadle fire strategy has to deal with.
A timber framed business park
Work on Cheadle Eco Park began in March 2026. It has six units on seven acres with a timber structure instead of steel and is due to finish in March 2027. A timber frame changes how structural fire resistance and fire spread are assessed.
Taller homes around the station
The council's study suggests up to five storeys around the new station at densities of up to 200 homes per hectare. Flats at that scale need protected stairs, compartmentation between homes and access for fire appliances.
A Grade I church and three conservation areas
The Church of St Mary was built between 1520 and 1558 and is listed Grade I. Cheadle Village has been a conservation area since 1974, with Brooklyn Crescent following in 1979 and Cheadle Royal in 1995.
A listed hospital wing
The main wing of Cheadle Royal Hospital on Wilmslow Road, built in 1848 and 1849, is listed Grade II. Works there have to respect the historic fabric as well as the guidance.
Building types
The building types we see in Cheadle
- Fire Strategy for Offices and Commercial Buildings
Business units at Cheadle Eco Park
- Fire Strategy for Blocks of Flats and Apartments
New homes in the district centre and around the station
- Fire Strategy for Heritage Buildings and Conversions
Listed buildings in the village and at Cheadle Royal
- Fire Strategy for Transport and Infrastructure
The planned single platform station
What we deliver
Fire strategy services in Cheadle.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read moreCommon questions
Fire strategy questions in Cheadle, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsThey are separate district centres in the borough of Stockport. Both go to Stockport Council for planning. The fire station that carries Cheadle's name is on Turves Road in Cheadle Hulme.
Guides
Guides worth reading first.
Nearby
All locationsFire strategy in Cheadle
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply