Skip to content

Cardiff city centre, Cathays Park, Butetown and Atlantic Wharf

Cardiff has 27 conservation areas, around 1,000 listed buildings and a 16,500 capacity indoor arena planned to open at Atlantic Wharf in 2028. We write fire strategies for Cardiff's civic and Victorian buildings, its venues and the schemes coming forward while the city's replacement plan is examined.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Cardiff buildings

Cardiff Council and the Live Nation and Robertson Property consortium announced financial close on the Atlantic Wharf arena on 28th August 2025, naming McLaren Construction as contractor. The announcement says the venue will create over 1,000 jobs and draw more than one million visitors a year. Its grand opening is planned for 2028.

The adopted Cardiff Local Development Plan 2006 to 2026 dates from 28th January 2016. Its replacement for 2021 to 2036 is at examination, where hearings ran in June 2026. A consultation on proposed changes closed on 6th November 2026 and the hearings are due to resume on 1st December 2026.

The council counts around 1,000 listed buildings and about 300 locally listed ones. Many of its 27 conservation areas carry Article 4 Directions that control minor alterations such as new windows. South Wales Fire and Rescue Service runs four wholetime stations in the city, at Cardiff Central, Roath, Ely and Whitchurch.

Who decides

Who approves a fire strategy in Cardiff

Planning
Cardiff Council (official source, opens in a new tab)
Applications for building or demolition work in the city are made through Planning Portal Wales.
Building control
Cardiff Council Building Control Section (official source, opens in a new tab)
Council surveyors examine plans and inspect work on site. Cardiff Council is also the building control authority for higher-risk building work, under the Welsh procedures in force since 1st July 2026.
Fire station
Cardiff Central Fire Station (official source, opens in a new tab)
A wholetime station on Adam Street. A fire service news item from Cardiff Bay features its aerial ladder platform.
Local plan
Cardiff Replacement LDP 2021 to 2036 (official source, opens in a new tab)
At examination, with hearings due to restart on 1st December 2026.

Local issues

What a Cardiff fire strategy has to deal with.

01

An arena for 16,500 people

The Atlantic Wharf arena is planned to hold 16,500 people. A crowd of that size needs exit routes, smoke control and stewarding designed together. Fire appliances must still be able to reach the building while the audience is leaving.

02

Grade I civic buildings

City Hall in Cathays Park and the Pier Head Building of 1896 are both listed Grade I (Cadw records 13744 and 14055). Upgrading alarms or compartment walls in buildings of this rank has to respect fabric protected by listed building consent.

03

A Victorian market under one roof

Cardiff Central Market opened on 8th May 1891 and is listed Grade II* (Cadw record 13811). Smoke can travel quickly beneath a single open roof. Detection, stall layout and the routes to each street entrance need planning as one.

04

Concert hall and theatre

St David's Hall, the National Concert Hall built between 1978 and 1982, was listed Grade II on 10th May 2023. The New Theatre opened on 10th December 1906 and is also Grade II. A seated audience in either building has to clear through foyers that listing now protects.

Building types

The building types we see in Cardiff

Common questions

Fire strategy questions in Cardiff, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

The plan adopted in January 2016 runs to 2026. A replacement for 2021 to 2036 is at examination, with hearings due to restart on 1st December 2026.

Guides

Guides worth reading first.

More in Wales

All locations

Fire strategy in Cardiff

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.