Skip to content

Bristol city centre, Temple Quarter and Frome Gateway

Bristol City Council's vision for Temple Quarter is to transform 135 hectares of brownfield land around the Grade I Temple Meads Station over 25 years, creating 10,000 new homes. We write fire strategies for Bristol's regeneration sites, its listed theatre and halls and the shared houses caught by the city's new Article 4 directions.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Bristol buildings

The council's cabinet endorsed a development framework for Temple Quarter in May 2023, saying the area would bring £1.6bn of annual income to the city economy. A regeneration framework for Frome Gateway followed in February 2024. The University of Bristol describes its Temple Quarter Enterprise Campus as a new campus in the heart of the city.

The Bristol Local Plan 2022 to 2040 was submitted to the Secretary of State on 25th April 2024. The council said it expected adoption in late 2026 and began preparing a further plan, the Bristol Local Plan 2045, in June 2026. Bristol has 33 conservation areas, from College Green and St James Parade to The Downs and Westbury-on-Trym.

Building work in Bristol is inspected by the city council's own building control team at notified stages. Avon Fire and Rescue built Temple Fire Station on Temple Back in 2016. It is crewed 24 hours a day by wholetime firefighters and carries a turntable ladder alongside two fire engines.

Who decides

Who approves a fire strategy in Bristol

Planning
Bristol City Council (official source, opens in a new tab)
Sets planning policy for the city and is a constituent council of the West of England Combined Authority.
Building control
Bristol City Council Building Control (official source, opens in a new tab)
Inspects work when it reaches each notified stage. Any higher-risk building is a matter for the Building Safety Regulator.
Fire station
Temple Fire Station (official source, opens in a new tab)
Built in 2016, with a turntable ladder, a rope rescue vehicle and a breathing apparatus service vehicle.
Regeneration
Bristol Temple Quarter (official source, opens in a new tab)
The council's page on the development framework endorsed in May 2023.

Local issues

What a Bristol fire strategy has to deal with.

01

Phased blocks around a Grade I station

Temple Meads Station has been listed Grade I since 1st November 1966 and sits at the centre of the Temple Quarter plans. Over a programme of 25 years, a block finished early may be occupied while neighbouring plots are still being built. Each phase needs its own escape and fire engine access that does not depend on unfinished land.

02

Small HMOs under new rules

From 1st January 2027 turning a house into a small HMO will need planning permission in parts of Brislington, Frome Vale, Purdown, Southmead and Horfield, St George and Westbury Park. Shared houses need interlinked detection and a protected route out from every letting room.

03

A Grade I working theatre

The Theatre Royal, home of the Bristol Old Vic, was listed Grade I on 8th January 1959. Stage, auditorium and backstage areas each carry a different fire risk. The separation between them has to work within fabric that is hard to alter.

04

Concert and civic halls

Bristol Beacon is listed Grade II and the Council House on College Green is Grade II*. Large assembly spaces in buildings of this kind need fire upgrades agreed with conservation officers as well as with building control.

Building types

The building types we see in Bristol

Common questions

Fire strategy questions in Bristol, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Bristol City Council runs its own building control service and inspects at set stages of the work. Higher-risk buildings are approved by the Building Safety Regulator instead.

Guides

Guides worth reading first.

More in South West England

All locations

Fire strategy in Bristol

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.