Bath city centre, Milsom Quarter and Bath Central Riverside
Bath was inscribed as a whole city World Heritage Site in 1987, joined the Great Spa Towns of Europe in 2021 and is replacing its 1938 fire station with one faced in Bath Stone. We write fire strategies for Grade I civic rooms, a listed theatre and station, shared houses and the Old Post Office as it becomes the Fashion Museum.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Bath buildings
Council news of 26th October 2026 reported that the West of England Mayoral Combined Authority had approved £7 million of additional investment for Fashion Museum Bath and the wider Milsom Quarter. The museum is moving into the Grade II listed Old Post Office with a collection of 100,000 objects and is expected to open in 2030. The council projects more than 250,000 visitors a year.
Bath and North East Somerset Council held the Regulation 19 consultation on its new Local Plan from 18th September to 30th October 2026, the final consultation stage before submission for independent examination. The adopted plan is still the Core Strategy, the Placemaking Plan and the Local Plan Partial Update.
Bath Fire Station, one of the oldest in Avon Fire and Rescue Service, was built in 1938 and is now being rebuilt. The old building has significant structural defects and only five bays for six vehicles. The new one will be faced mainly in Bath Stone and is due to open in summer 2027.
Who decides
Who approves a fire strategy in Bath
- Planning
- Bath and North East Somerset Council (official source, opens in a new tab)
- A unitary council whose new Local Plan, running to 2042, finished its Regulation 19 consultation on 30th October 2026.
- Building control
- B&NES Building Control (official source, opens in a new tab)
- The council's own team at Lewis House on Manvers Street. Work on a higher-risk building goes to the Building Safety Regulator for approval instead.
- Fire station
- Bath Fire Station (official source, opens in a new tab)
- Holds three fire engines, a turntable ladder, a rescue boat and an animal rescue vehicle. It runs from a temporary site on Roseberry Road during the rebuild.
- Regeneration
- Bath City Centre Regeneration Programme (official source, opens in a new tab)
- Covers Bath Central Riverside, the Bath High Street Renewal Programme and Milsom Quarter.
Local issues
What a Bath fire strategy has to deal with.
A museum in the Old Post Office
The Grade II listed Old Post Office is to hold 100,000 objects and is projected to draw more than 250,000 visitors a year. Its strategy has to protect the collection and clear large visitor numbers without stripping out historic fabric.
Grade I civic rooms
The Guildhall on the High Street, the Assembly Rooms on Alfred Street and the Grand Pump Room are all listed Grade I. A change of use or event layout has to find escape widths, detection and fire doors that the listed interiors can accept.
A listed working theatre
The Theatre Royal and the former Garrick's Head on St John's Place are listed Grade II*. Stage and auditorium must stay separated by fire resisting construction while escape routes suit a seated audience in a historic plan.
Shared houses in a heritage city
The council has confirmed an Article 4 direction for houses in multiple occupation in Bath. Converting a house for sharers means protecting the stair and separating bedrooms in a way the World Heritage setting can absorb.
Building types
The building types we see in Bath
- Fire Strategy for Heritage Buildings and Conversions
The Guildhall, the Assembly Rooms, the Grand Pump Room and the Old Post Office
- Fire Strategy for Retail and Leisure Buildings
The Theatre Royal and the Milsom Quarter
- Fire Strategy for Hospitals and Healthcare Buildings
The Royal United Hospitals Bath and its Dyson Cancer Centre
- Fire Strategy for Transport and Infrastructure
Bath Spa Station on Manvers Street, listed Grade II* in 1972
What we deliver
Fire strategy services in Bath.

Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read moreCommon questions
Fire strategy questions in Bath, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsBath and North East Somerset Council runs its own building control team from Lewis House on Manvers Street. The same council is the planning authority for the city.
Guides
Guides worth reading first.
More in South West England
All locationsFire strategy in Bath
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply